Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 4, 2020, 06:49 AM
  • 22 0862_22 0861 _12032020_230618.mp4

Date
12/03/2020
W/O
855105
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00803
PipeID
P17229
Time
10:49 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8231
Sewer Name
DALTON TRUNK, SECTION 3
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_854956_TV22105_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
22 0862
Downstream MH
22 0861
Dir. of Survey
Downstream
Length Surveyed
350.3 ft.
Total Length
350.3 ft.
Structural Index
3
Structural Quick
5M3M
Structural Rating
690
O&M Index
2
O&M Quick
2R00
O&M Rating
190
Overall Index
3
Overall Quick
Overall Rating
880
Pipe schematic from manhole 22 0862 to 22 0861
MH: 22 0862MH: 22 0861downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 08620 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. MGO - General Observation - 75% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.2 ft. LL - Alignment Left, 20 %, Start107 ft. TBI - Tap Break-In Intruding, at 01 o'clock, -, -, within 8 inches of joint: YES, 4", 1", 8" - ACTIVE118.4 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"119.6 ft. LL - Alignment Left, 20 %, Finish161.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"208.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"247.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"311.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"331.8 ft. OBR - Obstacles Rocks, 10 %of cross sectional area, at 06 o'clock, Start347.7 ft. OBR - Obstacles Rocks, 10 %of cross sectional area, at 06 o'clock, Finish347.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish347.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish348 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish348 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish350 ft. MGO - General Observation - ROACHES @ MH350.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0861350.3 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPED

Observation photos (7)

  • General Observation - 75% MAG COAT

    2 ft. - General Observation - 75% MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Alignment Left, 20 %, Start

    7.2 ft. - Alignment Left, 20 %, Start

  • Tap Break-In Intruding, at 01 o'clock, -, -, within 8 inches of joint: YES, 4", 1", 8" - ACTIVE

    107 ft. - Tap Break-In Intruding, at 01 o'clock, -, -, within 8 inches of joint: YES, 4", 1", 8" - ACTIVE

  • Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"

    118.4 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"

  • Obstacles Rocks, 10 %of cross sectional area, at 06 o'clock, Start

    331.8 ft. - Obstacles Rocks, 10 %of cross sectional area, at 06 o'clock, Start

Observations (26)

DistanceCodeObservation
0MWM
347.7OBR
2MGO75% MAG COAT
350.3AMH22 0861
0AMH22 0862
208.7TFC
2DAGS
311.4TFC
7.2LL
119.6LL
107TBIACTIVE
2SAP
2SSS
348DAGS
347.7SAP
2SRV
0MWL
350.3MGOCONN @ MH 9 O'CLOCK/CAPPED
161.6TFC
247.9TFC
331.8OBR
347.7SSS
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
350MGOROACHES @ MH
348SRV
118.4TBA

Properties (6)

custom_field_three
AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2020-12-03T22:49:17-08:00
documentation
PRO PIPE
is_lateral_inspection
false