Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 31, 2016, 07:38 AM
  • 19 0250_19 0249_8312016_034947.mp4

Date
08/31/2016
W/O
0585465
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00728
PipeID
P15220
Time
12:38 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0263
Sewer Name
19 STUDEBAKER ROAD TRUNK
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
01
Purpose
Routine Assessment
Project
20160829MDM_STUDEBAKER_ROAD_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
19 0250
Downstream MH
19 0249
Dir. of Survey
Downstream
Length Surveyed
322.6 ft.
Total Length
322.6 ft.
Structural Index
1
Structural Quick
1100
Structural Rating
1
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
3
Pipe schematic from manhole 19 0250 to 19 0249
MH: 19 0250MH: 19 0249downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:45AM0 ft. MWL - Water Level, 5 %of cross sectional area9.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open9.9 ft. MGO - General Observation - 15" VCP27.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open30.7 ft. JSM - Joint Separated Medium - SEALED AROUND JOINT87.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open110.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open128.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open144.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open183.5 ft. MGP - General Photograph198.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open215.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open238.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open252.1 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE256 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open310 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open322.3 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE322.6 ft. AMH - Downstream Manhole, Survey Ends - 4:15AM

Observation photos (3)

  • General Observation - 15" VCP

    9.9 ft. - General Observation - 15" VCP

  • Joint Separated Medium - SEALED AROUND JOINT

    30.7 ft. - Joint Separated Medium - SEALED AROUND JOINT

  • General Photograph

    183.5 ft. - General Photograph

Observations (20)

DistanceCodeObservation
310TFOpen
128.1TFOpen
0MWM
322.6AMH4:15AM
183.5MGP
238.6TFOpen
252.1DSZSLUDGE
215.3TFOpen
30.7JSMSEALED AROUND JOINT
110.6TFOpen
9.9TFOpen
0AMH3:45AM
9.9MGO15" VCP
87.4TFOpen
144.7TFOpen
256TFOpen
198.6TFOpen
27.2TFOpen
0MWL
322.3DSZSLUDGE

Properties (6)

custom_field_three
JOINT SEPARATED MEDUIM SEALED
custom_field_two
4
customer
LACSD
datetime
2016-08-31T00:38:32-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false