21 0650_21 0649_8262016_005420.mp4
2 ft. - General Observation - MAG COAT 98% START 8:00 TO 4:00
8 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR UNDER MAG COAT
9.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLIDTERING PEELING CONCRETE UNDER MAG COAT
44.4 ft. - General Photograph - 98% MAG COAT
107.7 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM LONG REBAR
114.6 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, - SEVERE AGG UNDER REBAR
117.3 ft. - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: NO - LONG REBAR
137.1 ft. - Surface Spalling, from 09 to 11 o'clock, within 8 inches of joint: YES - PEELING CONCRETE
158.5 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SEVERE AGG
166.9 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - CIRCUM REBAR& MISSING
173.4 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
176.9 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - LONG REBAR
180.7 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM LONG REBAR
196.8 ft. - Surface Reinforcement Corroded, from 01 to 02 o'clock, within 8 inches of joint: NO
211.4 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO
214.8 ft. - Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: YES - LONG REBAR
232.1 ft. - Surface Reinforcement Corroded, from 01 to 02 o'clock, within 8 inches of joint: NO
292.6 ft. - Surface Reinforcement Corroded, at 01 o'clock, within 8 inches of joint: NO
| Distance | Code | Observation |
|---|---|---|
| 114.6 | SAP | SEVERE AGG UNDER REBAR |
| 341 | SRC | LONG REBAR |
| 341 | SSS | BLISTERING PEELING CONCRETE |
| 341 | SRC | CIRCUM REBAR & MISSING |
| 294.2 | TFC | Capped |
| 341 | SRC | — |
| 341 | SAP | SEVERE AGG & MISSING |
| 180.7 | SRC | CIRCUM LONG REBAR |
| 0 | MWM | — |
| 176.9 | MGO | MAG COAT 95% START |
| 173.4 | SAP | SEVERE AGG |
| 166.9 | SRC | CIRCUM REBAR& MISSING |
| 341.5 | AMH | 1:50AM |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 341 | SAP | SEVERE AGG |
| 214.8 | SRC | LONG REBAR |
| 158.5 | SAV | SEVERE AGG |
| 137.1 | SSS | PEELING CONCRETE |
| 211.4 | SRC | — |
| 9.8 | SSS | BLIDTERING PEELING CONCRETE UNDER MAG COAT |
| 0 | AMH | 12:45AM |
| 176.9 | SRC | LONG REBAR |
| 292.6 | SRC | — |
| 107.7 | SAV | SEVERE AGG |
| 44.4 | MGP | 98% MAG COAT |
| 2 | MGO | MAG COAT 98% START 8:00 TO 4:00 |
| 8 | SRV | CIRCUM REBAR UNDER MAG COAT |
| 107.7 | SRV | CIRCUM LONG REBAR |
| 232.1 | SRC | — |
| 0 | MWL | — |
| 196.8 | SRC | — |
| 117.3 | SRV | LONG REBAR |
| 341 | MGO | MAG COAT 95% FINISH |