Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 21, 2016, 04:05 PM
  • 19 0038_19 0037_8212016_091034.mp4

Date
08/21/2016
W/O
0585475
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00725
PipeID
P15068
Time
9:05 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7211
Sewer Name
19 FULLERTON ROAD TRUNK
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary
District
District 19
Page No.
09
Purpose
Routine Assessment
Project
20160821AM_FULLERTON_ROAD_TRUNK_PART_2
Material
Vitrified Clay Pipe
Shape
Other
Height
12 in.
Upstream MH
19 0038
Downstream MH
19 0037
Dir. of Survey
Downstream
Length Surveyed
331.9 ft.
Total Length
331.9 ft.
Structural Index
3
Structural Quick
5142
Structural Rating
54
O&M Index
2
O&M Quick
412B
O&M Rating
38
Overall Index
2
Overall Quick
Overall Rating
92
Pipe schematic from manhole 19 0038 to 19 0037
MH: 19 0038MH: 19 0037downstream0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 9:09 AM1.3 ft. MWLS - Water Level, Sag in pipe, 40 %of cross sectional area, Start8.9 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES8.9 ft. CC - Crack Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES12.4 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area, Change19.2 ft. B - Broken, from 10 to 01 o'clock, within 8 inches of joint: YES19.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 02 o'clock, , within 8 inches of joint: YES21.9 ft. MWLS - Water Level, Sag in pipe, 60 %of cross sectional area, Change29 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area, Change39.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 02 o'clock, , within 8 inches of joint: YES39.7 ft. CM - Crack Multiple, from 01 to 02 o'clock, within 8 inches of joint: YES45 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES59.9 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area, Finish59.9 ft. MWL - Water Level, 15 %of cross sectional area80.4 ft. MWLS - Water Level, Sag in pipe, 30 %of cross sectional area, Start95.5 ft. MWLS - Water Level, Sag in pipe, 35 %of cross sectional area, Change105.8 ft. CM - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES105.8 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES116.1 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES116.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES121.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES121.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 10 to 04 o'clock, , within 8 inches of joint: YES126.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 09 o'clock, , within 8 inches of joint: YES131.5 ft. MWLS - Water Level, Sag in pipe, 35 %of cross sectional area, Finish136.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES136.6 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES141.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES141.8 ft. CM - Crack Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES146.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES151.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, at 12 o'clock, , within 8 inches of joint: YES156.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start156.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start162.1 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES163.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"168.1 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES180.2 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES190.2 ft. JOM - Joint Offset Medium210.8 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES212.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"223.7 ft. DAE - Deposits Attached Encrustation, 10 % TO 15 % of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES265.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"302.3 ft. MGO - General Observation - INFILTRATION SEEPING OUT308.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"319.8 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES324.8 ft. FM - Fracture Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES330 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish330 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish330 ft. MGO - General Observation - SAGS THROUGHOUT THE REACH330 ft. MGO - General Observation - SLIGHT GREASE/DEBRIS/CALCIUM THROUGHOUT THE REACH330.4 ft. MGO - General Observation - ROACHES INSIDE THE MH.331.9 ft. AMH - Downstream Manhole, Survey Ends - 10:00 AM

Observation photos (21)

  • Water Level, 40 %of cross sectional area

    0 ft. - Water Level, 40 %of cross sectional area

  • Crack Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES

    8.9 ft. - Crack Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 50 %of cross sectional area, Change

    12.4 ft. - Water Level, Sag in pipe, 50 %of cross sectional area, Change

  • Broken, from 10 to 01 o'clock, within 8 inches of joint: YES

    19.2 ft. - Broken, from 10 to 01 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 60 %of cross sectional area, Change

    21.9 ft. - Water Level, Sag in pipe, 60 %of cross sectional area, Change

  • Water Level, Sag in pipe, 50 %of cross sectional area, Change

    29 ft. - Water Level, Sag in pipe, 50 %of cross sectional area, Change

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 02 o'clock,  , within 8 inches of joint: YES

    39.6 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 02 o'clock, , within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    45 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Water Level, 15 %of cross sectional area

    59.9 ft. - Water Level, 15 %of cross sectional area

  • Water Level, Sag in pipe, 30 %of cross sectional area, Start

    80.4 ft. - Water Level, Sag in pipe, 30 %of cross sectional area, Start

  • Water Level, Sag in pipe, 35 %of cross sectional area, Change

    95.5 ft. - Water Level, Sag in pipe, 35 %of cross sectional area, Change

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    105.8 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 09 o'clock,  , within 8 inches of joint: YES

    126.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 09 o'clock, , within 8 inches of joint: YES

  • Water Level, Sag in pipe, 35 %of cross sectional area, Finish

    131.5 ft. - Water Level, Sag in pipe, 35 %of cross sectional area, Finish

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    162.1 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    168.1 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    210.8 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 10 % TO 15 % of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    223.7 ft. - Deposits Attached Encrustation, 10 % TO 15 % of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • General Observation - INFILTRATION SEEPING OUT

    302.3 ft. - General Observation - INFILTRATION SEEPING OUT

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock,  , within 8 inches of joint: YES

    319.8 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES

  • Fracture Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES

    324.8 ft. - Fracture Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES

Observations (54)

DistanceCodeObservation
29MWLS
136.6CM
151.9DAE
190.2JOM
59.9MWLS
105.8CM
8.9CL
1.3MWLS
223.7DAE
302.3MGOINFILTRATION SEEPING OUT
116.1CL
21.9MWLS
39.7CM
45CM
19.2B
330DAE
146.9DAE
0MWM
330CM
0MGOROACHES INSIDE THE MH.
8.9CC
95.5MWLS
180.2DAE
0MWL
136.6DAE
163.7TFC
141.8DAE
116.1DAE
331.9AMH10:00 AM
19.2DAE
131.5MWLS
39.6DAE
162.1DAE
59.9MWL
212.3TFC
105.8DAE
210.8DAE
330.4MGOROACHES INSIDE THE MH.
126.2DAE
156.9CM
308.3TFC
324.8FM
80.4MWLS
168.1DAE
121.1CM
330MGOSAGS THROUGHOUT THE REACH
330MGOSLIGHT GREASE/DEBRIS/CALCIUM THROUGHOUT THE REACH
265.7TFC
12.4MWLS
319.8DAE
0AMH9:09 AM
121.1DAE
156.9DAE
141.8CM

Properties (6)

custom_field_three
BROKEN PIPE
custom_field_two
1
customer
LACSD
datetime
2016-08-21T09:05:52-07:00
documentation
MIRANDA & FRANKLIN
is_lateral_inspection
false