Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 19, 2016, 10:26 AM
  • H 0252_H 0251_8192016_040238.mp4

Date
08/19/2016
W/O
0
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00171
PipeID
P10675
Time
3:26 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0244
Sewer Name
H JOINT OUTFALL H - UNIT 2F
City
VERNON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
16
Purpose
Maintenance Related
Project
20160818MDM_JOINT_OUTFALL_H_UNIT_2F
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
H 0252
Downstream MH
H 0251
Dir. of Survey
Downstream
Length Surveyed
337.7 ft.
Total Length
337.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
3124
O&M Rating
11
Overall Index
2
Overall Quick
Overall Rating
11
Pipe schematic from manhole H 0252 to H 0251
MH: H 0252MH: H 0251downstream0 ft. AMH - Upstream Manhole, Survey Begins - 3:50AM0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area - NO FLOW1 ft. MGO - General Observation - POST GRESE CCTV5.5 ft. MGO - General Observation - 21" VCP66 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start73.5 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES76.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped79.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped85.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish89.2 ft. DAGS - Deposits Attached Grease, 2 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Start130.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start176.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open179.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE188.4 ft. DAGS - Deposits Attached Grease, 2%of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Finish217.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start239.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish273.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Active279.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped337.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish337.7 ft. AMH - Downstream Manhole, Survey Ends - 4:10AM

Observation photos (4)

  • General Observation - 21" VCP

    5.5 ft. - General Observation - 21" VCP

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    66 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES

    73.5 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    217.2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
179.6TFACTIVE
217.2DAGS
76.8TFCCapped
89.2DAGS
239.1DAGS
176.9TFOpen
273.5TFActive
337.7AMH4:10AM
279.5TFCCapped
66DAGS
130.5DAGS
73.5DAGS
85.3DAGS
79.3TFCCapped
188.4DAGS
0AMH3:50AM
1MGOPOST GRESE CCTV
5.5MGO21" VCP
0MWM
337.4DAGS
0MWLNO FLOW

Properties (5)

additional_info
POST GREASE CCTV
customer
LACSD
datetime
2016-08-19T03:26:37-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false