Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 19, 2016, 10:24 AM
  • H 0253_H 0252_8192016_033940.mp4

Date
08/19/2016
W/O
0
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00171
PipeID
P10676
Time
3:24 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0244
Sewer Name
H JOINT OUTFALL H - UNIT 2F
City
VERNON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
16
Purpose
Maintenance Related
Project
20160818MDM_JOINT_OUTFALL_H_UNIT_2F
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
H 0253
Downstream MH
H 0252
Dir. of Survey
Downstream
Length Surveyed
319.6 ft.
Total Length
319.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole H 0253 to H 0252
MH: H 0253MH: H 0252downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:25AM0 ft. MWL - Water Level, 5 %of cross sectional area - NO FLOW1 ft. MGO - General Observation - POST GREASE CCTV4.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open18 ft. MGP - General Photograph30 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open56.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped60.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open102.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped116.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped199 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open200.7 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open257.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Active260 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped319.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish319.6 ft. AMH - Downstream Manhole, Survey Ends - 3:40AM

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Photograph

    18 ft. - General Photograph

Observations (18)

DistanceCodeObservation
199TFOpen
0MWM
319.2DAGS
200.7TFOpen
0AMH3:25AM
260TFCCapped
60.6TFOpen
0MWLNO FLOW
56.9TFCCapped
9TBOpen
1MGOPOST GREASE CCTV
319.6AMH3:40AM
102.3TFCCapped
257.9TFActive
18MGP
30TFOpen
116.4TFCCapped
4.3DAGS

Properties (5)

additional_info
POST GREASE CCTV
customer
LACSD
datetime
2016-08-19T03:24:23-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false