Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 19, 2016, 06:55 AM
  • H 0254_H 0253_8182016_025856.mp4

Date
08/18/2016
W/O
0
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00171
PipeID
P10677
Time
11:55 PM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0244
Sewer Name
H JOINT OUTFALL H - UNIT 2F
City
VERNON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
16
Purpose
Maintenance Related
Project
20160818MDM_JOINT_OUTFALL_H_UNIT_2F
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
H 0254
Downstream MH
H 0253
Dir. of Survey
Downstream
Length Surveyed
336.6 ft.
Total Length
336.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
3125
O&M Rating
13
Overall Index
2
Overall Quick
Overall Rating
13
Pipe schematic from manhole H 0254 to H 0253
MH: H 0254MH: H 0253downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area - NO FLOW0 ft. AMH - Upstream Manhole, Survey Begins - 2:50AM1 ft. MGO - General Observation - POST GREASE CCTV8.2 ft. MGO - General Observation - 21" VCP8.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open60.6 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start82.8 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start82.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped82.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish86.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open102 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish113.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open149.2 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open149.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Start149.2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - GREASE SLUDGE188 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active200.8 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open202.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES236.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open246 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES251 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped278.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped280.8 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open336.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Finish - GREASE336.1 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - GREASE336.6 ft. AMH - Downstream Manhole, Survey Ends - 3:15AM

Observation photos (5)

  • General Observation - 21" VCP

    8.2 ft. - General Observation - 21" VCP

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    60.6 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 15 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    82.8 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - GREASE SLUDGE

    149.2 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - GREASE SLUDGE

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES

    246 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES

Observations (27)

DistanceCodeObservation
278.4TFCCapped
86.7TFOpen
202.2DAGS
82.8DAGS
200.8TBOpen
336.6AMH3:15AM
149.2TBOpen
149.2DAGS
188TBActive
236.6TFOpen
8.2MGO21" VCP
336.1DAGSGREASE
82.8TFCCapped
251TFCCapped
149.2DSZGREASE SLUDGE
82.8DAGS
113.8TFOpen
8.2TFOpen
246DAGS
0MWM
336.1DSZGREASE
0MWLNO FLOW
280.8TBOpen
102DAGS
1MGOPOST GREASE CCTV
0AMH2:50AM
60.6DAGS

Properties (5)

additional_info
POST GREASE CCTV
customer
LACSD
datetime
2016-08-18T23:55:34-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false