0 ft. - General Observation - MAG COAT 40% START 9:00 TO 3:00
2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
11.1 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
34.9 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG
43.5 ft. - General Observation - MAG COAT 80% START
46.4 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG
63.2 ft. - Water Mark, 80 %of cross sectional area
70.6 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
70.6 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
87.5 ft. - General Observation - MAG COAT 90% START 10:00 TO 2:00
96.1 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
145.4 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 70.6 | SSS | BLISTERING PEELING CONCRETE |
| 0 | AMH | 5:05AM |
| 2 | SAV | SEVERE AGG |
| 204.6 | MWM | — |
| 0 | MGO | MAG COAT 40% START 9:00 TO 3:00 |
| 96.1 | SAP | SEVERE AGG |
| 328.1 | SSS | BLISTERING PEELING CONCRETE |
| 43.5 | MGO | MAG COAT 80% START |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MWL | — |
| 34.9 | SAV | SEVERE AGG |
| 145.4 | SAP | SEVERE AGG |
| 70.6 | SSS | — |
| 70.6 | SAP | SEVERE AGG |
| 328.1 | MGO | MAG COAT 90% FINISH |
| 0 | MWM | — |
| 11.1 | SAV | SEVERE AGG |
| 87.5 | MGO | MAG COAT 90% START 10:00 TO 2:00 |
| 70.6 | SAV | — |
| 328.1 | SAP | SEVERE AGG |
| 46.4 | SAV | SEVERE AGG |
| 63.2 | MWM | — |
| 328.8 | AMH | 5:35AM |