Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 20, 2016, 09:20 AM
Date
06/20/2016
W/O
0574862
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00325
PipeID
P08289
Time
2:20 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6722
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
SAN GABRIEL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Capital Improvement Program Assesment
Project
20160618MDM_JOA_1A_SAN_JOSE_CREEK_WRP_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
A 0379
Downstream MH
A 0378
Dir. of Survey
Downstream
Length Surveyed
658.9 ft.
Total Length
658.9 ft.
Structural Index
3
Structural Quick
3[2Y
Structural Rating
687
O&M Index
4
O&M Quick
5142
O&M Rating
13
Overall Index
3
Overall Quick
Overall Rating
700
Pipe schematic from manhole A 0379 to A 0378
MH: A 0379MH: A 0378downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:20AM0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE8.4 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG27 ft. MWM - Water Mark, 60 %of cross sectional area27 ft. MGO - General Observation - MAG COAT 80% START 9:00 TO 3:0032.3 ft. SAP - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG70.4 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG95.1 ft. MGO - General Observation - MAG COAT 80% 10:00 TO 2:0095.1 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE95.1 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG95.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish95.1 ft. MWM - Water Mark, 80 %of cross sectional area95.1 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG110.6 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG147.1 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG163.8 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG306.5 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG443.7 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG580.1 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG658.2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE658.2 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG658.3 ft. MGO - General Observation - MAG COAT 80% FINISH658.9 ft. AMH - Downstream Manhole, Survey Ends - 3:10AM

Observation photos (16)

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    8.4 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Water Mark, 60 %of cross sectional area

    27 ft. - Water Mark, 60 %of cross sectional area

  • General Observation - MAG COAT 80% START 9:00 TO 3:00

    27 ft. - General Observation - MAG COAT 80% START 9:00 TO 3:00

  • Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG

    32.3 ft. - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    70.4 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Observation - MAG COAT 80% 10:00 TO 2:00

    95.1 ft. - General Observation - MAG COAT 80% 10:00 TO 2:00

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    95.1 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    95.1 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    110.6 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    147.1 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    163.8 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

    306.5 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    443.7 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    580.1 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (26)

DistanceCodeObservation
27MWM
95.1MGOMAG COAT 80% 10:00 TO 2:00
95.1SSSBLISTERING PEELING CONCRETE
32.3SAPSEVERE AGG
658.3MGOMAG COAT 80% FINISH
2SAVSEVERE AGG
110.6SAVSEVERE AGG
658.9AMH3:10AM
95.1SAVSEVERE AGG
95.1SSS
658.2SSSBLISTERING PEELING CONCRETE
443.7SAVSEVERE AGG
0AMH2:20AM
95.1MWM
8.4SAVSEVERE AGG
147.1SAVSEVERE AGG
95.1SAVSEVERE AGG
0MWM
306.5SAVSEVERE AGG
580.1SAVSEVERE AGG
27MGOMAG COAT 80% START 9:00 TO 3:00
2SSSBLISTERING PEELING CONCRETE
0MWL
658.2SAVSEVERE AGG
163.8SAVSEVERE AGG
70.4SAVSEVERE AGG

Properties (6)

custom_field_three
SEVERE AGG VISIBLE
custom_field_two
3
customer
LACSD
datetime
2016-06-20T02:20:00-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection