C 0177A_C 0177_672016_083134.mp4
-0.1 ft. - Water Level, 0 %of cross sectional area - DRY LINE
0 ft. - Upstream Manhole, Survey Begins - 8:28 AM
2 ft. - General Observation - 90% MAG COAT FROM 08 TO 04 O'CLOCK, START
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start
66.9 ft. - Deposits Attached Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Change
109.9 ft. - General Observation - 90% MAG COAT FROM 07 TO 05 O'CLOCK, CHANGE
| Distance | Code | Observation |
|---|---|---|
| -0.1 | MWL | DRY LINE |
| 2 | MGO | 90% MAG COAT FROM 08 TO 04 O'CLOCK, START |
| 2 | SAV | — |
| 281.3 | AMH | 8:50 AM |
| 279.7 | SSS | — |
| 109.9 | DAZ | — |
| 279.7 | MGO | 90% MAG COAT FROM 07 TO 05 O'CLOCK, FINISH |
| 0 | AMH | 8:28 AM |
| 2 | DAZ | MAG COAT |
| 279.7 | SAV | SPORADICALLY THROUGHOUT THE REACH |
| 2 | SSS | — |
| 109.9 | MGO | 90% MAG COAT FROM 07 TO 05 O'CLOCK, CHANGE |
| 66.9 | DAZ | — |