Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 8, 2016, 08:10 AM
  • 15 0153_15 0152_682016_042924.mp4

Date
06/08/2016
W/O
0568722
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00635
PipeID
P12054
Time
1:10 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0153
Sewer Name
15 TYLER AVENUE RELIEF TRUNK
City
EL MONTE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
23
Purpose
Routine Assessment
Project
20160606MDM_TYLER_AVENUE_RELIEF_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
15 0153
Downstream MH
15 0152
Dir. of Survey
Downstream
Length Surveyed
680.6 ft.
Total Length
680.6 ft.
Structural Index
2
Structural Quick
3224
Structural Rating
14
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
14
Pipe schematic from manhole 15 0153 to 15 0152
MH: 15 0153MH: 15 0152downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:35AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING LAITANCE COAT8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - LAITANCE COAT44.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING LATANCE COAT268.5 ft. SAV - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SEVERE AGG413.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - LAITANCE COAT PEELING631.7 ft. SAV - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC680.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active680.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERIONG PEELING LAITANCE COAT680.6 ft. AMH - Downstream Manhole, Survey Ends - 5:10AM

Observation photos (6)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING LAITANCE COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING LAITANCE COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - LAITANCE COAT

    8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - LAITANCE COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING LATANCE COAT

    44.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING LATANCE COAT

  • Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SEVERE AGG

    268.5 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - LAITANCE COAT PEELING

    413.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - LAITANCE COAT PEELING

  • Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    631.7 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

Observations (12)

DistanceCodeObservation
0MWM
0AMH4:35AM
0MWL
680.2MGOConn. @ Mh, 3 O' Clock. Active
268.5SAVSEVERE AGG
680.6AMH5:10AM
413.6SSSLAITANCE COAT PEELING
680.2SSSBLISTERIONG PEELING LAITANCE COAT
631.7SAVSEVERE AGG SPORATIC
2SSSBLISTERING PEELING LAITANCE COAT
44.1SSSPEELING LATANCE COAT
8SSSLAITANCE COAT

Properties (6)

custom_field_three
SPALLING LAITANCE COAT-FEW SEVERE AGG
custom_field_two
4
customer
LACSD
datetime
2016-06-08T01:10:20-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false