Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 24, 2016, 04:19 PM
  • 18 0280_18 0279_5242016_092141.mp4

Date
05/24/2016
W/O
0568850
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00702
PipeID
P14108
Time
9:19 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7129
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
20160523AM_SHOEMAKER_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
18 0280
Downstream MH
18 0279
Dir. of Survey
Downstream
Length Surveyed
416.8 ft.
Total Length
416.8 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole 18 0280 to 18 0279
MH: 18 0280MH: 18 0279downstream0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 9:20 AM2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start2 ft. MGO - General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, START2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start10.8 ft. MGO - General Observation - 70% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE21.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"24.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"73.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"76.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"76.1 ft. MGO - General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE84.4 ft. MGO - General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH121.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"124.8 ft. TFD - Tap Factory Made Defective, at 11 o'clock, -, within 8 inches of joint: YES, 6" - CAPPED, BROKEN157 ft. MGO - General Observation - 50% MAG COAT FROM 09 TO 03 O'CLOCK, START173.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"176.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"224.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"228 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"273.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN276.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN276.5 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 6"285.1 ft. MGO - General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE325.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"328 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"376.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"379.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"414.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish414.9 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish414.9 ft. MGO - General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH414.9 ft. MGO - General Observation - SAGS THROUGHOUT THE REACH415.8 ft. MGO - General Observation - ROACHES INSIDE THE MH.416.8 ft. AMH - Downstream Manhole, Survey Ends - 10:00 AM

Observation photos (10)

  • Upstream Manhole, Survey Begins - 9:20 AM

    0 ft. - Upstream Manhole, Survey Begins - 9:20 AM

  • General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, START

    2 ft. - General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, START

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

  • General Observation - 70% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

    10.8 ft. - General Observation - 70% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

  • General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

    76.1 ft. - General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

  • General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH

    84.4 ft. - General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH

  • Tap Factory Made Defective, at 11 o'clock, -, within 8 inches of joint: YES, 6" - CAPPED, BROKEN

    124.8 ft. - Tap Factory Made Defective, at 11 o'clock, -, within 8 inches of joint: YES, 6" - CAPPED, BROKEN

  • General Observation - 50% MAG COAT FROM 09 TO 03 O'CLOCK, START

    157 ft. - General Observation - 50% MAG COAT FROM 09 TO 03 O'CLOCK, START

  • General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

    285.1 ft. - General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

  • General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH

    414.9 ft. - General Observation - 30% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH

Observations (35)

DistanceCodeObservation
76.1TFC
2SSS
176.5TFC
73.2TFC
415.8MGOROACHES INSIDE THE MH.
121.7TFC
0MGOROACHES INSIDE THE MH.
0MWL
379.8TFC
124.8TFDCAPPED, BROKEN
376.7TFC
0MWM
224.8TFC
276.5TBA
2MGO30% MAG COAT FROM 09 TO 03 O'CLOCK, START
414.9SSS
276.4TFOPEN
84.4MGO30% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH
76.1MGO30% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE
325.1TFC
10.8MGO70% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE
157MGO50% MAG COAT FROM 09 TO 03 O'CLOCK, START
328TFC
2SAV
21.1TFC
285.1MGO30% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE
24.2TFC
228TFC
414.9SAV
414.9MGO30% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH
414.9MGOSAGS THROUGHOUT THE REACH
0AMH9:20 AM
173.3TFC
273.6TFUNKNOWN
416.8AMH10:00 AM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2016-05-24T09:19:17-07:00
documentation
MIRANDA, SHADLER, FRANKLIN
is_lateral_inspection
false