Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 24, 2016, 03:39 PM
  • 18 0281_18 0280_5242016_084856.mp4

Date
05/24/2016
W/O
0568850
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00702
PipeID
P14109
Time
8:39 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7129
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
20160523AM_SHOEMAKER_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
18 0281
Downstream MH
18 0280
Dir. of Survey
Downstream
Length Surveyed
348.2 ft.
Total Length
348.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 18 0281 to 18 0280
MH: 18 0281MH: 18 0280downstream0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. AMH - Upstream Manhole, Survey Begins - 8:50 AM0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. MGO - General Observation - 70% MAG COAT FROM 09 TO 03 O'CLOCK, START2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start18.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN22 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"36.9 ft. MGO - General Observation - 40% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE71 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"73.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN79.1 ft. MGO - General Observation - 60% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE119.6 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 4"122.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN168.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"171.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"216.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN219.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"268.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"271.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"319.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN323.1 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 6" - POSSIBLY DEFECTIVE, CRACKED345.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish345.5 ft. MGO - General Observation - SAGS THROUGHOUT THE REACH345.5 ft. MGO - General Observation - 60% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH345.5 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish346.3 ft. MGO - General Observation - ROACHES INSIDE THE MH.348.2 ft. AMH - Downstream Manhole, Survey Ends - 9:17 AM

Observation photos (9)

  • Upstream Manhole, Survey Begins - 8:50 AM

    0 ft. - Upstream Manhole, Survey Begins - 8:50 AM

  • Water Level, 35 %of cross sectional area

    0 ft. - Water Level, 35 %of cross sectional area

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

  • General Observation - 40% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

    36.9 ft. - General Observation - 40% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN

    73.9 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN

  • General Observation - 60% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

    79.1 ft. - General Observation - 60% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

  • Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN

    216.9 ft. - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN

  • Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 6" - POSSIBLY DEFECTIVE, CRACKED

    323.1 ft. - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 6" - POSSIBLY DEFECTIVE, CRACKED

Observations (29)

DistanceCodeObservation
268.4TFC
348.2AMH9:17 AM
345.5SSS
119.6TFA
345.5MGOSAGS THROUGHOUT THE REACH
345.5MGO60% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH
2MGO70% MAG COAT FROM 09 TO 03 O'CLOCK, START
171.1TFC
319.8TFUNKNOWN
219.9TFC
323.1TFAPOSSIBLY DEFECTIVE, CRACKED
271.6TFC
122.7TFUNKNOWN
22TFC
36.9MGO40% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE
71TFC
168.1TFC
0MGOROACHES INSIDE THE MH.
216.9TFUNKNOWN
0AMH8:50 AM
345.5SAV
2SAV
346.3MGOROACHES INSIDE THE MH.
2SSS
0MWL
73.9TFUNKNOWN
18.9TFUNKNOWN
0MWM
79.1MGO60% MAG COAT FROM 09 TO 03 O'CLOCK, CHANGE

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2016-05-24T08:39:07-07:00
documentation
MIRANDA, SHADLER, FRANKLIN
is_lateral_inspection
false