2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
13.4 ft. - General Observation - MAG COAT 50% START
13.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
26.8 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG
66.7 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: NO, - CIRCUM REBAR
69.5 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
77 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | MH CONN OPEN 3:00 LARGE CONN |
| 13.4 | MGO | MAG COAT 50% START |
| 21.8 | IW | — |
| 66.7 | SRV | CIRCUM REBAR |
| 26.8 | SAP | SEVERE AGG |
| 78.8 | IW | — |
| 160.1 | SSS | PEELING CONCRETE |
| 45.9 | IW | — |
| 13.4 | SAV | SEVERE AGG |
| 2 | SAP | SEVERE AGG |
| 30.2 | IW | — |
| 13.4 | SAP | SEVERE AGG |
| 0 | MWM | — |
| 6.1 | IW | — |
| 126.1 | IW | — |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 0 | MWL | — |
| 47.1 | SAP | — |
| 160.1 | SAV | SEVERE AGG |
| 69.5 | SRV | CIRCUM REBAR |
| 0 | AMH | 2:10AM |
| 160.5 | AMH | 2:40AM |
| 77 | SAV | SEVERE AGG |
| 61.8 | IW | — |
| 110 | IW | — |