Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 21, 2016, 02:37 PM
  • 15 0374_15 0373_5212016_073904.mp4

Date
05/21/2016
W/O
0563341
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00598
PipeID
P12300
Time
7:37 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7127
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
18
Purpose
Routine Assessment
Project
20160521AM_BALDWIN_PARK_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
15 0374
Downstream MH
15 0373
Dir. of Survey
Downstream
Length Surveyed
373 ft.
Total Length
373 ft.
Structural Index
3
Structural Quick
4132
Structural Rating
14
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
14
Pipe schematic from manhole 15 0374 to 15 0373
MH: 15 0374MH: 15 0373downstream0 ft. AMH - Upstream Manhole, Survey Begins - 7:37 AM0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK0 ft. MWL - Water Level, 30 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start47.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN119 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES144.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN185.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN208.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES258.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN291.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN306 ft. FC - Fracture Circumferential, from 08 to 09 o'clock, within 8 inches of joint: YES371.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish371.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish372.9 ft. MGO - General Observation - ROACHES INSIDE THE MH.373 ft. AMH - Downstream Manhole, Survey Ends - 8:01 AM

Observation photos (4)

  • Upstream Manhole, Survey Begins - 7:37 AM

    0 ft. - Upstream Manhole, Survey Begins - 7:37 AM

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    119 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Circumferential, from 08 to 09 o'clock, within 8 inches of joint: YES

    306 ft. - Fracture Circumferential, from 08 to 09 o'clock, within 8 inches of joint: YES

Observations (19)

DistanceCodeObservation
0AMH7:37 AM
306FC
47.3TFOPEN
373AMH8:01 AM
258.6TFOPEN
144.9TFOPEN
372.9MGOROACHES INSIDE THE MH.
208.4CM
185.7TFOPEN
0MGOROACHES INSIDE THE MH.
2SAV
0MWM
371.2SSS
291.3TFOPEN
0MGOACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK
2SSS
371.2SAV
0MWL
119FM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2016-05-21T07:37:17-07:00
documentation
MIRANDA & FRANKLIN
is_lateral_inspection
false