Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 17, 2016, 07:30 AM
  • 01 0162_01 0254_5172016_004856.mp4

Date
05/17/2016
W/O
0573886
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00218
PipeID
P01300
Time
12:30 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Heavy Cleaning
Media Label
H0135R
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
SOUTH GATE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Maintenance Related
Project
20160517MDM_SOUTH_PARK_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
01 0162
Downstream MH
01 0254
Dir. of Survey
Downstream
Length Surveyed
274 ft.
Total Length
274 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 01 0162 to 01 0254
MH: 01 0162MH: 01 0254downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:35AM0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active OUT GOING TAKING ALL FLOW0 ft. MGO - General Observation - ROOT EVALUATION ONLY0 ft. MWL - Water Level, 0 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area60.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open108.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open154 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open190.4 ft. MGO - General Observation - 18" VCP198.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open274 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN274 ft. AMH - Downstream Manhole, Survey Ends - 12:55AM

Observation photos (1)

  • General Observation - 18" VCP

    190.4 ft. - General Observation - 18" VCP

Observations (12)

DistanceCodeObservation
154TFOpen
0AMH12:35AM
198.3TFOpen
0MGOConn. @ Mh, 9 O' Clock. Active OUT GOING TAKING ALL FLOW
190.4MGO18" VCP
0MGOROOT EVALUATION ONLY
60.1TFOpen
0MWL
108.6TFOpen
274MGOConn. @ Mh, 3 O' Clock. OPEN
274AMH12:55AM
0MWM

Properties (5)

additional_info
ROOT EVALUATION ONLY
customer
LACSD
datetime
2016-05-17T00:30:00-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false