Wastewater/Activity/PacpInspection/1.0May 14, 2016, 12:46 PM
  • C 0304_C 0303_5142016_060205.mp4

Date
05/14/2016
W/O
0563393
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00134
PipeID
P09764
Time
5:46 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H 01312
Sewer Name
C JOINT OUTFALL C - UNIT 6E
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
20160514MDM_JOINT_OUTFALL_C_UNIT_6E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
C 0304
Downstream MH
C 0303
Dir. of Survey
Downstream
Length Surveyed
496.8 ft.
Total Length
496.8 ft.
Structural Index
3
Structural Quick
5134
Structural Rating
21
O&M Index
2
O&M Quick
512E
O&M Rating
65
Overall Index
2
Overall Quick
Overall Rating
86
Pipe schematic from manhole C 0304 to C 0303
MH: C 0304MH: C 0303downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 6:00AM2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE2 ft. MGO - General Observation - MAG COAT 10% START6 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC8.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES12.7 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish20.8 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped24.3 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC61.1 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped68.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped76.2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC81.7 ft. MWM - Water Mark, 20 %of cross sectional area118.1 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped118.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC118.4 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish118.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish118.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE125.8 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped166.7 ft. TBC - Tap Break-In Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6" - Capped170.6 ft. IG - Infiltration Gusher, at 09 o'clock, within 8 inches of joint: YES174.6 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped215 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Active215 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: NO222.8 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped263.5 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped271.2 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped292.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: YES308.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES320.6 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped328.4 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped341.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: YES348.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES368.7 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: NO368.7 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped372.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: YES377.2 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped389.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES397.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock, , within 8 inches of joint: YES417.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: NO417.2 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped422.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES425.7 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped446.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES470.7 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: YES, 6" - Active470.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: YES474.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open486.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start486.2 ft. MWL - Water Level, 40 %of cross sectional area496.4 ft. MWLS - Water Level, Sag in pipe, 40 %of cross sectional area - POSSIBLE SAG IN MH496.4 ft. MGO - General Observation - MAG COAT 10% FINISH496.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING BLISTERING CONCRETE496.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC496.4 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish496.8 ft. AMH - Downstream Manhole, Survey Ends - 6:55AM

Observation photos (8)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE

  • General Observation - MAG COAT 10% START

    2 ft. - General Observation - MAG COAT 10% START

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    6 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES

    8.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG  SPORATIC

    24.3 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    76.2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    118.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Deposits Attached Grease, 10 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    486.2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

Observations (56)

DistanceCodeObservation
61.1TBCCapped
215TBActive
417.2DAE
6SAVSEVERE AGG SPORATIC
486.2DAGS
166.7TBCCapped
486.2MWL
496.4MWLSPOSSIBLE SAG IN MH
496.4MGOMAG COAT 10% FINISH
470.7TBActive
496.4SSSPEELING BLISTERING CONCRETE
308.7DAE
118.4SAVSEVERE AGG SPORATIC
397.9DAE
20.8TBCCapped
348.9DAE
215DAE
292.4DAE
328.4TBCCapped
118.1TBCCapped
174.6TBCCapped
118.4SRV
320.6TBCCapped
372.8DAE
470.7DAE
68.8TFCCapped
271.2TBCCapped
0MWM
24.3SRVSEVERE AGG SPORATIC
417.2TBCCapped
341.1DAE
76.2SAVSEVERE AGG SPORATIC
263.5TBCCapped
422.2DAE
446.4DAE
8.5DAE
496.4SAVSEVERE AGG SPORATIC
474.2TBOpen
368.7DAE
425.7TBCCapped
0MWL
2SSSPEELING BLISTERING CONCRETE
12.7SAV
0AMH6:00AM
2MGOMAG COAT 10% START
125.8TBCCapped
118.4SSS
368.7TBCCapped
118.4SSSPEELING BLISTERING CONCRETE
377.2TBCCapped
496.4DAGS
222.8TBCCapped
496.8AMH6:55AM
81.7MWM
170.6IG
389.4DAE

Properties (6)

custom_field_three
SEVERE VISIBLE AGG
custom_field_two
3
customer
LACSD
datetime
2016-05-14T05:46:00-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection