Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 14, 2016, 11:44 AM
  • C 0305_C 0304_5142016_045451.mp4

Date
05/14/2016
W/O
0563393
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00134
PipeID
P09765
Time
4:44 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H 01312
Sewer Name
C JOINT OUTFALL C - UNIT 6E
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
20160514MDM_JOINT_OUTFALL_C_UNIT_6E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
C 0305
Downstream MH
C 0304
Dir. of Survey
Downstream
Length Surveyed
457.4 ft.
Total Length
457.4 ft.
Structural Index
2
Structural Quick
3227
Structural Rating
20
O&M Index
2
O&M Quick
332E
O&M Rating
65
Overall Index
2
Overall Quick
Overall Rating
85
Pipe schematic from manhole C 0305 to C 0304
MH: C 0305MH: C 0304downstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:50AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. OPEN2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE UNDER MAG COAT2 ft. MGO - General Observation - MAG COAT 98% START 9:00 TO 3:0020.1 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6", 6" - Capped28.3 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped47.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO47.3 ft. MWL - Water Level, 10 %of cross sectional area60.7 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped68.8 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped102.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO114 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 09 o'clock, , within 8 inches of joint: YES116.3 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: NO117.8 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped125.8 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped130.1 ft. ID - Infiltration Dripper, from 12 to 01 o'clock, within 8 inches of joint: YES130.1 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES135.8 ft. TBD - Tap Break-In Defective, at 02 o'clock, -, , within 8 inches of joint: NO, 6" - Active 70% BLOCKED MINERAL DEPOSITES166.3 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped174.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: NO174.7 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped178.8 ft. IW - Infiltration Weeper, from 12 to 03 o'clock, within 8 inches of joint: YES178.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES190.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO222.9 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped231.5 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped246.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO271.5 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped279.3 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped289.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES291.7 ft. MGO - General Observation - MAG COAT 70% START300.4 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES310.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES327.9 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped332.4 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES339.5 ft. SAV - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC369.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: NO369.3 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped376.6 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped397.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES417.5 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Capped425.2 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Capped430.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: YES441.7 ft. SAV - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG VERY SPORATIC446.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES457 ft. MGO - General Observation - MAG COAT 70% FINISH457 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING BLISTERING CONCRETE457.4 ft. AMH - Downstream Manhole, Survey Ends - 5:40AM

Observation photos (15)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE UNDER MAG COAT

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING CONCRETE UNDER MAG COAT

  • General Observation - MAG COAT 98% START 9:00 TO 3:00

    2 ft. - General Observation - MAG COAT 98% START 9:00 TO 3:00

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

    47.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

    102.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 10 o'clock,  , within 8 inches of joint: NO

    116.3 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: NO

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock,  , within 8 inches of joint: YES

    130.1 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES

  • Tap Break-In Defective, at 02 o'clock, -,  , within 8 inches of joint: NO, 6" - Active 70% BLOCKED MINERAL DEPOSITES

    135.8 ft. - Tap Break-In Defective, at 02 o'clock, -, , within 8 inches of joint: NO, 6" - Active 70% BLOCKED MINERAL DEPOSITES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

    190.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

    246.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

    289.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

  • General Observation - MAG COAT 70% START

    291.7 ft. - General Observation - MAG COAT 70% START

  • Deposits Attached Encrustation, 15 %of cross sectional area, from 12 to 04 o'clock,  , within 8 inches of joint: YES

    300.4 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

    310.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    339.5 ft. - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG VERY SPORATIC

    441.7 ft. - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG VERY SPORATIC

Observations (50)

DistanceCodeObservation
116.3DAE
20.1TBCCapped
102.3SSS
457.4AMH5:40AM
47.3SSS
2SSSPEELING BLISTERING CONCRETE UNDER MAG COAT
166.3TBCCapped
246.9SSS
289.2SSS
0MWL
174.7DAE
425.2TBCCapped
222.9TBCCapped
376.6TBCCapped
369.3DAE
279.3TBCCapped
0AMH4:50AM
117.8TBCCapped
397.5DAE
417.5TBCCapped
0MWM
441.7SAVSEVERE AGG VERY SPORATIC
190.1SSS
135.8TBDActive 70% BLOCKED MINERAL DEPOSITES
291.7MGOMAG COAT 70% START
332.4DAE
369.3TBCCapped
178.8IW
125.8TBCCapped
130.1ID
430.2DAE
28.3TBCCapped
47.3MWL
271.5TBCCapped
60.7TBCCapped
174.7TBCCapped
68.8TBCCapped
457MGOMAG COAT 70% FINISH
310.5SSS
327.9TBCCapped
0MGOConn. @ Mh, 9 O' Clock. OPEN
130.1DAE
2MGOMAG COAT 98% START 9:00 TO 3:00
114DAE
231.5TBCCapped
446.5DAE
457SSSPEELING BLISTERING CONCRETE
339.5SAVSEVERE AGG SPORATIC
300.4DAE
178.8DAE

Properties (6)

custom_field_three
SEVERE VISIBLE AGG
custom_field_two
3
customer
LACSD
datetime
2016-05-14T04:44:40-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false