C 0308_C 0307_5142016_023912.mp4
2 ft. - General Observation - OLD MAG COAT 70% 8:00 TO 4: START
2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERIN PEELING CONCRETE
18.8 ft. - General Observation - MAG COAT 95% START
49.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING BLISTERING CONCRETE UNDER MAG COAT
102.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO
115.3 ft. - Infiltration Weeper, from 11 to 01 o'clock, within 8 inches of joint: YES, Start
132.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO
157.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO
190.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO
220.6 ft. - General Observation - MAG COAT 80% START
425.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO
| Distance | Code | Observation |
|---|---|---|
| 163.8 | TF | Active |
| 18.8 | TF | Open |
| 49.7 | SSS | PEELING BLISTERING CONCRETE UNDER MAG COAT |
| 449.7 | AMH | 2:50AM |
| 157.6 | SSS | — |
| 0 | MWL | — |
| 18.8 | MGO | MAG COAT 95% START |
| 132.3 | SSS | — |
| 2 | MGO | OLD MAG COAT 70% 8:00 TO 4: START |
| 102.4 | SSS | — |
| 387.3 | IW | — |
| 449.2 | MGO | MAG COAT 80% FINISH |
| 328.9 | DAE | — |
| 190.8 | SSS | — |
| 449.2 | SSS | BLISTERING PEELING CONCRETE |
| 425.4 | SSS | — |
| 242.8 | DAGS | — |
| 244.2 | TF | Active |
| 0 | MWM | — |
| 0 | AMH | 2:15AM |
| 380 | TFC | Capped |
| 2.3 | SSS | BLISTERIN PEELING CONCRETE |
| 380 | DAE | — |
| 92 | TF | Active |
| 375.9 | DAE | — |
| 387.3 | DAE | — |
| 163.8 | IW | — |
| 339.9 | TF | Active |
| 220.6 | MGO | MAG COAT 80% START |
| 115.3 | IW | — |