Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 13, 2016, 11:49 AM
Date
05/13/2016
W/O
0557606
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00015
PipeID
P00141
Time
4:49 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6702
Sewer Name
08 MAIN STREET RELIEF TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
07
Purpose
Capital Improvement Program Assesment
Project
20160513MDM_MAIN_STREET_RELIEF_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Upstream MH
08 0555
Downstream MH
08 0554
Dir. of Survey
Downstream
Length Surveyed
460.5 ft.
Total Length
460.5 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 08 0555 to 08 0554
MH: 08 0555MH: 08 0554downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:55AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - MG COAT 99% ATART 8:00 TO 4:008 ft. MGP - General Photograph - MAG COAT72.9 ft. SSS - Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: YES - BLISTERING CONCRETE UNDER MAG COAT87.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE UNDER MAG COAT172.5 ft. MGO - General Observation - 100% MAG COAT327.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE UNDER MAG COAT331.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8" - ACTIVE378.5 ft. MGP - General Photograph378.5 ft. MGP - General Photograph460.1 ft. MGO - General Observation - MAG COAT 99% FINISH460.5 ft. AMH - Downstream Manhole, Survey Ends - 5:40AM

Observation photos (8)

  • General Observation - MG COAT 99% ATART 8:00 TO 4:00

    2 ft. - General Observation - MG COAT 99% ATART 8:00 TO 4:00

  • General Photograph - MAG COAT

    8 ft. - General Photograph - MAG COAT

  • Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: YES - BLISTERING CONCRETE UNDER MAG COAT

    72.9 ft. - Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: YES - BLISTERING CONCRETE UNDER MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE UNDER MAG COAT

    87.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE UNDER MAG COAT

  • General Observation - 100% MAG COAT

    172.5 ft. - General Observation - 100% MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE UNDER MAG COAT

    327.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE UNDER MAG COAT

  • General Photograph

    378.5 ft. - General Photograph

  • General Photograph

    378.5 ft. - General Photograph

Observations (14)

DistanceCodeObservation
460.5AMH5:40AM
378.5MGP
460.1MGOMAG COAT 99% FINISH
172.5MGO100% MAG COAT
378.5MGP
0MWM
331.4TFACTIVE
8MGPMAG COAT
0AMH4:55AM
87.6SSSBLISTERING CONCRETE UNDER MAG COAT
0MWL
72.9SSSBLISTERING CONCRETE UNDER MAG COAT
327.9SSSBLISTERING CONCRETE UNDER MAG COAT
2MGOMG COAT 99% ATART 8:00 TO 4:00

Properties (7)

custom_field_three
99% MAG COAT
custom_field_two
5
customer
LACSD
datetime
2016-05-13T04:49:09-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false
year_laid
19720923