Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 7, 2016, 03:20 PM
  • 15 0380_15 0379_572016_082305.mp4

Date
05/07/2016
W/O
0563341
Weather
Light Rain
Operator/Surveyor
MIRANDA
Sewer ID
Z00598
PipeID
P12306
Time
8:20 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7110
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
18
Purpose
Routine Assessment
Project
20160507AM_BALDWIN_PARK_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
15 0380
Downstream MH
15 0379
Dir. of Survey
Downstream
Length Surveyed
331.9 ft.
Total Length
331.9 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
12
Pipe schematic from manhole 15 0380 to 15 0379
MH: 15 0380MH: 15 0379downstream0 ft. MGO - General Observation - ACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. MGO - General Observation - CAPPED CONN. INSIDE THE MH. @ 09 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 8:21 AM0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start2 ft. MMC - Material Change, Other (state in comments) - CONCRETE PIPE61.1 ft. MWL - Water Level, 20 %of cross sectional area72.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"107.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"156.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"209.8 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, 35% BLOCKED258 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN262.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"310.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"321.6 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES328.8 ft. FC - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: NO330.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish330.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish331 ft. MGO - General Observation - ROACHES INSIDE THE MH.331.9 ft. AMH - Downstream Manhole, Survey Ends - 8:42 AM

Observation photos (8)

  • Upstream Manhole, Survey Begins - 8:21 AM

    0 ft. - Upstream Manhole, Survey Begins - 8:21 AM

  • Water Level, 35 %of cross sectional area

    0 ft. - Water Level, 35 %of cross sectional area

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Water Level, 20 %of cross sectional area

    61.1 ft. - Water Level, 20 %of cross sectional area

  • Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, 35% BLOCKED

    209.8 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, 35% BLOCKED

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    321.6 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: NO

    328.8 ft. - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: NO

Observations (23)

DistanceCodeObservation
2SSS
72.7TFA
2SAV
0MGOACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK
331.9AMH8:42 AM
328.8FC
2MMCCONCRETE PIPE
0MGOROACHES INSIDE THE MH.
209.8TFDACTIVE, 35% BLOCKED
321.6FL
0MGOCAPPED CONN. INSIDE THE MH. @ 09 O'CLOCK
330.1SSS
262.5TFA
0AMH8:21 AM
331MGOROACHES INSIDE THE MH.
107.9TFC
156.7TFC
310.7TFC
330.1SAV
0MWL
61.1MWL
0MWM
258TFOPEN

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2016-05-07T08:20:26-07:00
documentation
MIRANDA & SHADLER
is_lateral_inspection
false