Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 7, 2016, 02:02 PM
  • 15 0381_15 0380_572016_080204.mp4

Date
05/07/2016
W/O
0563341
Weather
Light Rain
Operator/Surveyor
MIRANDA
Sewer ID
Z00598
PipeID
P12307
Time
7:02 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7110
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
18
Purpose
Routine Assessment
Project
20160507AM_BALDWIN_PARK_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
15 0381
Downstream MH
15 0380
Dir. of Survey
Downstream
Length Surveyed
369.3 ft.
Total Length
369.3 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 15 0381 to 15 0380
MH: 15 0381MH: 15 0380downstream0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 8:00 AM0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. MMC - Material Change, Other (state in comments) - CONCRETE PIPE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start33.4 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6"52.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"121.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN169.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"214.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"299.4 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, BROKEN367 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish367 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish367.1 ft. MGO - General Observation - ROACHES INSIDE THE MH.367.1 ft. MGO - General Observation - ACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK367.1 ft. MGO - General Observation - CAPPED CONN. INSIDE THE MH. @ 09 O'CLOCK369.3 ft. AMH - Downstream Manhole, Survey Ends - 8:20 AM

Observation photos (3)

  • Material Change, Other (state in comments) - CONCRETE PIPE

    2 ft. - Material Change, Other (state in comments) - CONCRETE PIPE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, BROKEN

    299.4 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, BROKEN

Observations (19)

DistanceCodeObservation
367SAV
0MGOROACHES INSIDE THE MH.
299.4TFDOPEN, BROKEN
0MWM
169.8TFC
0AMH8:00 AM
2MMCCONCRETE PIPE
367SSS
214.6TFA
33.4TBA
369.3AMH8:20 AM
2SSS
0MWL
367.1MGOROACHES INSIDE THE MH.
367.1MGOACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK
52.3TFA
121.1TFOPEN
2SAV
367.1MGOCAPPED CONN. INSIDE THE MH. @ 09 O'CLOCK

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2016-05-07T07:02:22-07:00
documentation
MIRANDA & SHADLER
is_lateral_inspection
false