Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 7, 2016, 02:01 PM
  • 15 0382_15 0381_572016_073228.mp4

Date
05/07/2016
W/O
0563341
Weather
Light Rain
Operator/Surveyor
MIRANDA
Sewer ID
Z00598
PipeID
P12308
Time
7:01 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7110
Sewer Name
15 BALDWIN PARK TRUNK
City
BALDWIN PARK
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
18
Purpose
Routine Assessment
Project
20160507AM_BALDWIN_PARK_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
15 0382
Downstream MH
15 0381
Dir. of Survey
Downstream
Length Surveyed
315.3 ft.
Total Length
315.3 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 15 0382 to 15 0381
MH: 15 0382MH: 15 0381downstream0 ft. MGO - General Observation - ACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK0 ft. MGO - General Observation - CAPPED CONN. INSIDE THE MH. @ 09 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 7:31 AM0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start2 ft. MMC - Material Change, Other (state in comments) - CONCRETE PIPE2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start23.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN112.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"113.2 ft. TBD - Tap Break-In Defective, at 02 o'clock, -, , within 8 inches of joint: NO, 4", 4" - ACTIVE, 70% GREASE165 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4", 6"217.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN222.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN266.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"303.1 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 4"313.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish313.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish314.3 ft. MGO - General Observation - ROACHES INSIDE THE MH.315.3 ft. AMH - Downstream Manhole, Survey Ends - 7:51 AM

Observation photos (5)

  • Upstream Manhole, Survey Begins - 7:31 AM

    0 ft. - Upstream Manhole, Survey Begins - 7:31 AM

  • Water Level, 15 %of cross sectional area

    0 ft. - Water Level, 15 %of cross sectional area

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Tap Break-In Defective, at 02 o'clock, -,  , within 8 inches of joint: NO, 4", 4" - ACTIVE, 70% GREASE

    113.2 ft. - Tap Break-In Defective, at 02 o'clock, -, , within 8 inches of joint: NO, 4", 4" - ACTIVE, 70% GREASE

Observations (21)

DistanceCodeObservation
23.2TBOPEN
2SSS
2MMCCONCRETE PIPE
0MGOACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK
112.3TFC
0MGOCAPPED CONN. INSIDE THE MH. @ 09 O'CLOCK
0AMH7:31 AM
2SAV
0MWL
0MGOROACHES INSIDE THE MH.
0MWM
315.3AMH7:51 AM
266.2TFC
303.1TFA
313.6SAV
222.2TBOPEN
313.6SSS
113.2TBDACTIVE, 70% GREASE
314.3MGOROACHES INSIDE THE MH.
217.6TFOPEN
165TFC

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2016-05-07T07:01:45-07:00
documentation
MIRANDA & SHADLER
is_lateral_inspection
false