0 ft. - General Observation - MAG COAT 70% START 8:00 TO 4:00
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
32.4 ft. - Infiltration Runner, from 10 to 11 o'clock, within 8 inches of joint: YES
80.9 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
94.9 ft. - Deposits Attached Encrustation, 20 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
94.9 ft. - Infiltration Runner, from 08 to 04 o'clock, within 8 inches of joint: YES
118.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE
126.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC
157.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC
201.1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
212.1 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 407.5 | SSS | PEELING BLISTERING CONCRETE |
| 0 | MWL | — |
| 160.2 | DAE | — |
| 386.5 | DAE | — |
| 160.2 | IW | — |
| 104.7 | IW | — |
| 126.7 | SAV | SEVERE AGG SPORATIC |
| 201.1 | DAE | — |
| 396 | IW | — |
| 73.5 | IS | — |
| 94.9 | DAE | — |
| 323.5 | IW | — |
| 407.5 | SAV | SEVERE AGG SPORATIC |
| 346.7 | ID | — |
| 407.5 | MGO | MAG COAT 70% FINISH |
| 371.7 | IW | — |
| 16.6 | ID | — |
| 89.7 | IW | — |
| 157.5 | SAV | SEVERE AGG SPORATIC |
| 80.9 | ID | — |
| 32.4 | IR | — |
| 80.9 | DAE | — |
| 2 | SAV | SEVERE AGG SPORATIC |
| 0 | ID | INSIDE MH |
| 153 | ID | — |
| 379.5 | IW | — |
| 118.8 | SSS | PEELING CONCRETE |
| 94.9 | IR | — |
| 212.1 | SRV | CIRCUM REBAR |
| 0 | MWM | — |
| 386.5 | ID | — |
| 407.8 | AMH | 4:15AM |
| 355.6 | IW | — |
| 47.3 | ID | — |
| 0 | MGO | MAG COAT 70% START 8:00 TO 4:00 |
| 0 | AMH | 3:20AM |