2.1 ft. - General Observation - MAG COAT 70% START 8:00 TO 4:00
2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
9.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES - MINERIAL DEPOSIT AT JOINT
17.7 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: YES - MINERIAL DEPOSIT AT JOINT
41.1 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
65.9 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES - MINERIAL DEPOSITES
73.9 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 12 o'clock, , within 8 inches of joint: YES
82.9 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES
107.3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
154.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC
187 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: YES
224.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
258.7 ft. - Infiltration Gusher, from 11 to 01 o'clock, within 8 inches of joint: YES
258.7 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
268.4 ft. - Infiltration Gusher, from 01 to 03 o'clock, within 8 inches of joint: YES
278.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MINERIAL DEPOSITES AT JOINTS
289 ft. - General Observation - MAG COAt 10% start
474.3 ft. - General Observation - MAG COAT 60% START
630.9 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 630.9 | ID | — |
| 17.7 | DAE | MINERIAL DEPOSIT AT JOINT |
| 440.7 | IR | — |
| 180.1 | DAE | — |
| 98.2 | DAE | — |
| 139.3 | MGO | JOINT |
| 115.2 | MGO | JOINT |
| 512.2 | ID | — |
| 625.2 | ID | — |
| 187 | DAE | — |
| 258.7 | ID | — |
| 82.9 | DAE | — |
| 73.9 | DAE | — |
| 709.2 | AMH | 3:05AM |
| 679.8 | ID | — |
| 122.7 | DAE | — |
| 343.7 | ID | — |
| 82.9 | IW | — |
| 9.2 | DAE | MINERIAL DEPOSIT AT JOINT |
| 154.9 | SAV | SEVERE AGG SPORATIC |
| 170 | ID | — |
| 422.3 | ID | — |
| 268.4 | IG | — |
| 630.9 | DAE | — |
| 73.9 | IR | — |
| 289 | MGO | MAG COAt 10% start |
| 474.3 | MGO | MAG COAT 60% START |
| 122.7 | ID | — |
| 293.4 | ID | — |
| 107.3 | DAE | — |
| 0 | MWM | — |
| 65.9 | IR | — |
| 708.8 | ID | INSIDE MH |
| 130.9 | ID | — |
| 258.7 | IG | — |
| 2.1 | MGO | MAG COAT 70% START 8:00 TO 4:00 |
| 285.6 | ID | — |
| 519.5 | ID | — |
| 485.9 | IR | — |
| 0 | AMH | 1:40AM |
| 575.1 | ID | — |
| 708.9 | MGO | MAG COAT 60% FINISH |
| 414.1 | ID | — |
| 9.2 | ID | — |
| 429.4 | IG | — |
| 708.9 | DAE | MINERIAL DEPOSITES AT JOINTS |
| 544.5 | ID | — |
| 366.5 | ID | — |
| 41.1 | SRV | CIRCUM REBAR |
| 65.9 | DAE | MINERIAL DEPOSITES |
| 569 | ID | — |
| 708.9 | SSS | PEELING BLISTERTING CONCRETE |
| 2.1 | SSS | PEELING BLISTERING CONCRETE |
| 98.2 | ID | — |
| 154.9 | SAP | SEVERE AGG |
| 107.3 | ID | — |
| 336.1 | ID | — |
| 708.9 | SAV | SEVERE AGG SPORATIC |
| 462.7 | IW | — |
| 224.9 | SSS | PEELING CONCRETE |
| 2.1 | SAP | SEVERE AGG |
| 278.2 | DAE | MINERIAL DEPOSITES AT JOINTS |
| 187 | ID | — |
| 90.6 | MGO | JOINT |
| 551.9 | ID | — |
| 49.9 | IR | — |
| 325.8 | ID | — |
| 278.2 | ID | — |
| 224.9 | IG | — |
| 258.7 | DAE | — |
| 0 | MWL | — |
| 203.6 | ID | — |