Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 21, 2016, 08:12 AM
  • J 0238_J 0237_3212016_021620.mp4

Date
03/21/2016
W/O
0557681
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00057
PipeID
P11484
Time
1:12 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0096
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
PALOS VERDES
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
46
Purpose
Capital Improvement Program Assesment
Project
201603MDM_JOINT_OUTFALL_J_UNIT_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
J 0238
Downstream MH
J 0237
Dir. of Survey
Downstream
Length Surveyed
206.6 ft.
Total Length
206.6 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole J 0238 to J 0237
MH: J 0238MH: J 0237downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:10AM0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT2 ft. MGO - General Observation - MAG COAT 98% START 9:00 TO 3:00100.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT106.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - BLISTERING LAITANCE COAT206.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING BLISTERING LAITANCE COAT206.2 ft. MGO - General Observation - MH CONN STUB 9:00 AM206.2 ft. MGO - General Observation - MAG COAT 98% FINISH206.6 ft. AMH - Downstream Manhole, Survey Ends - 2:30AM

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING BLISTERING LAITANCE COAT

  • General Observation - MAG COAT 98% START 9:00 TO 3:00

    2 ft. - General Observation - MAG COAT 98% START 9:00 TO 3:00

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT

    100.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - BLISTERING LAITANCE COAT

    106.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - BLISTERING LAITANCE COAT

Observations (12)

DistanceCodeObservation
2SSSPEELING BLISTERING LAITANCE COAT
100.1SSSBLISTERING LAITANCE COAT
206.2SSSPEELING BLISTERING LAITANCE COAT
0AMH2:10AM
206.6AMH2:30AM
106.8SSSBLISTERING LAITANCE COAT
0MWM
206.2MGOMH CONN STUB 9:00 AM
206.2MGOMAG COAT 98% FINISH
0MGOConn. @ Mh, 9 O' Clock. Active
0MWL
2MGOMAG COAT 98% START 9:00 TO 3:00

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2016-03-21T01:12:59-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false