Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 19, 2016, 07:11 AM
  • J 0242_J 0241_3192016_041926.mp4

Date
03/19/2016
W/O
0557681
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00057
PipeID
P11488
Time
12:11 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0095
Sewer Name
J JOINT OUTFALL J - UNIT 1E
City
PALOS VERDES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
46
Purpose
Capital Improvement Program Assesment
Project
201603MDM_JOINT_OUTFALL_J_UNIT_1E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
J 0242
Downstream MH
J 0241
Dir. of Survey
Downstream
Length Surveyed
460.8 ft.
Total Length
460.8 ft.
Structural Index
2
Structural Quick
2400
Structural Rating
8
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
10
Pipe schematic from manhole J 0242 to J 0241
MH: J 0242MH: J 0241downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:50AM0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 95% 9:00 TO 3:0 START2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLIISTERING UNDER MAG COAT37.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES244.5 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES262.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO415.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES449.4 ft. MGO - General Observation - SLIGHT NORMAL GAP AT JOINT460.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING BLISTERING LAITANCE COAT UNDER MAG COAT460.4 ft. MGO - General Observation - MAG COAT 95% FINISH460.4 ft. MGO - General Observation - MH CONN OPEN 3:00460.8 ft. AMH - Downstream Manhole, Survey Ends - 4:20AM

Observation photos (6)

  • General Observation - MAG COAT 95% 9:00 TO 3:0 START

    2 ft. - General Observation - MAG COAT 95% 9:00 TO 3:0 START

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLIISTERING UNDER MAG COAT

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LAITANCE COAT PEELING BLIISTERING UNDER MAG COAT

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

    37.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

    262.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

    415.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

  • General Observation - SLIGHT NORMAL GAP AT JOINT

    449.4 ft. - General Observation - SLIGHT NORMAL GAP AT JOINT

Observations (14)

DistanceCodeObservation
0MWL
460.4SSSPEELING BLISTERING LAITANCE COAT UNDER MAG COAT
0AMH3:50AM
449.4MGOSLIGHT NORMAL GAP AT JOINT
0MWM
2MGOMAG COAT 95% 9:00 TO 3:0 START
37.1SSS
2SSSLAITANCE COAT PEELING BLIISTERING UNDER MAG COAT
415.3SSS
460.4MGOMAG COAT 95% FINISH
460.4MGOMH CONN OPEN 3:00
244.5DSGV
262.9SSS
460.8AMH4:20AM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2016-03-19T00:11:34-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false