B 0237_STACK_3182016_113420.mp4
0 ft. - Upstream Manhole, Survey Begins - MH. INSPECTION ONLY
0 ft. - General Observation - FRAME/RIM
1 ft. - General Observation - 32" LINER DOWN THE STACK
2 ft. - General Observation - CONCRETE/BRICK UNDER THE LINER
3 ft. - General Observation - WEST WALL
4 ft. - General Observation - NORTH WALL
5 ft. - General Observation - EAST WALL
6 ft. - General Observation - SOUTH WALL
7 ft. - General Observation - SHELF
8 ft. - General Observation - CHANNEL
9 ft. - General Observation - ROOF
10 ft. - General Observation - UNKNOWN CONN. INSIDE THE MH. @ 09 O'CLOCK, 50% BLOCKAGE
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | MH. INSPECTION ONLY |
| 2 | MGO | CONCRETE/BRICK UNDER THE LINER |
| 9 | MGO | ROOF |
| 6 | MGO | SOUTH WALL |
| 10 | MGO | UNKNOWN CONN. INSIDE THE MH. @ 09 O'CLOCK, 50% BLOCKAGE |
| 3 | MGO | WEST WALL |
| 4 | MGO | NORTH WALL |
| 8 | MGO | CHANNEL |
| 5 | MGO | EAST WALL |
| 11 | MSA | MH. INSPECTION COMPLETED |
| 1 | MGO | 32" LINER DOWN THE STACK |
| 7 | MGO | SHELF |
| 0 | MGO | FRAME/RIM |