2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING LAITANCE COAT UNDER MAG COAT
5 ft. - General Observation - MAG COAT 80% 8:00 TO 4:00 START
25 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING LAITANCE COAT
25 ft. - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG AT JOINT
42.4 ft. - Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: NO
104.1 ft. - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - POSSIBLE STUB
112.7 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES
296.5 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - PEELING LAITANCE COAT
323.8 ft. - Surface Aggregate Visible, from 08 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC
| Distance | Code | Observation |
|---|---|---|
| 353.3 | MGO | MAG COAT 80% FINISH |
| 104.1 | TFC | POSSIBLE STUB |
| 353.3 | MGO | MH CONN STUB 9:00 |
| 25 | SSS | PEELING LAITANCE COAT |
| 0 | MGO | MH CONN STUB 3:00 |
| 0 | AMH | 1:45AM |
| 2 | SSS | BLISTERING PEELING LAITANCE COAT UNDER MAG COAT |
| 323.8 | SAV | SEVERE AGG SPORATIC |
| 353.6 | AMH | 2:20AM |
| 296.5 | SSS | PEELING LAITANCE COAT |
| 5 | MGO | MAG COAT 80% 8:00 TO 4:00 START |
| 353.3 | MGO | MH CONN STUB 3:00 |
| 353.3 | SSS | PEELING BLISTERING LAITANCE COAT |
| 0 | MGO | MH CONN STUB 9:00 |
| 112.7 | SSS | — |
| 42.4 | SSS | — |
| 25 | SAV | SEVERE AGG AT JOINT |