Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 11, 2016, 01:00 PM
  • A 0523_A 0522_3112016_050924.mp4

Date
03/11/2016
W/O
0552352
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00315
PipeID
P20203
Time
5:00 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0090
Sewer Name
A JOA-1A DISTRICT 5 INTERCEPTOR
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
20
Purpose
Capital Improvement Program Assesment
Project
20160311MDM_JOA_1A_DISTRICT_5_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Rectangular
Height
0 in.
Upstream MH
A 0523
Downstream MH
A 0522
Dir. of Survey
Downstream
Length Surveyed
9.8 ft.
Total Length
9.8 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole A 0523 to A 0522
MH: A 0523MH: A 0522downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:10AM0 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. MGO - General Observation - MAG COAT 80% START9.4 ft. SAP - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG9.4 ft. MGO - General Observation - MAG COAT 80% FINISH9.8 ft. AMH - Downstream Manhole, Survey Ends - 5:25AM

Observation photos (2)

  • Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MAG COAT 80% START

    2 ft. - General Observation - MAG COAT 80% START

Observations (8)

DistanceCodeObservation
2SAPSEVERE AGG
9.4SAPSEVERE AGG
0MWL
2MGOMAG COAT 80% START
9.8AMH5:25AM
0AMH5:10AM
0MWM
9.4MGOMAG COAT 80% FINISH

Properties (6)

custom_field_three
SEVERE PROJECTING AGG
custom_field_two
3
customer
LACSD
datetime
2016-03-11T05:00:13-08:00
documentation
MARTIN,MANANES,OLIVER 111
is_lateral_inspection
false