Wastewater/Activity/PacpInspection/1.0Mar 10, 2016, 04:57 PM
  • 29 0435_29 0434_3102016_092613.mp4

Date
03/10/2016
W/O
0547103
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00989
PipeID
P24472
Time
8:57 AM
Certificate
U-115-06022628
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7074
Sewer Name
29 LEWIS AVENUE SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
20160310MI_LEWIS_AVENUE_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0434
Downstream MH
29 0435
Dir. of Survey
Upstream
Length Surveyed
309.2 ft.
Total Length
309.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 29 0434 to 29 0435
MH: 29 0434MH: 29 0435upstream0 ft. AMH - Upstream Manhole, Survey Ends - 10:05AM13.1 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6" - Capped18.9 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6" - Capped61.5 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6" - Capped71.7 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6" - Open86.4 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - RAGGING113.7 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6" - Capped120.4 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6" - Capped163.4 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6" - Capped173.2 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6" - Capped182.2 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 6" - Open216.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6" - Capped222.4 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6" - Capped265.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6" - Capped270.9 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 6" - Capped309.2 ft. AMH - Downstream Manhole, Survey Begins - 09:00AM309.2 ft. MWL - Water Level, 5 %of cross sectional area309.2 ft. MWM - Water Mark, 10 %of cross sectional area309.2 ft. MGO - General Observation - CONNECTION AT MH, 3 OCLOCK,

Observation photos (1)

  • Upstream Manhole, Survey Ends - 10:05AM

    309.2 ft. - Upstream Manhole, Survey Ends - 10:05AM

Observations (19)

DistanceCodeObservation
290.3TFCapped
44TFCCapped
247.7TFCapped
145.8TFCapped
93TFCCapped
38.3TFCCapped
136TFCCapped
0AMH09:00AM
0MWL
188.8TFCapped
0MWM
86.8TFCCapped
296.1TFCapped
127TBOpen
0MGOCONNECTION AT MH, 3 OCLOCK,
309.2AMH10:05AM
237.5TFOpen
222.8DSZRAGGING
195.5TFCCapped

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2016-03-10T08:57:57-08:00
documentation
IGNACIO, SHADLER, FRANKLIN
is_lateral_inspection
false