Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 9, 2016, 05:04 PM
  • 18 0583_18 0582_392016_091013.mp4

Date
03/09/2016
W/O
0557479
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00670
PipeID
P14432
Time
9:04 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7072
Sewer Name
18 BLOOMFIELD AVENUE TRUNK
City
NORWALK
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
20160304AM_BLOOMFIELD_AVENUE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Upstream MH
18 0582
Downstream MH
18 0583
Dir. of Survey
Upstream
Length Surveyed
352.3 ft.
Total Length
352.3 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 18 0582 to 18 0583
MH: 18 0582MH: 18 0583upstream0 ft. AMH - Upstream Manhole, Survey Ends - 9:26 AM2 ft. MGO - General Observation - ROACHES INSIDE THE MH.2 ft. MGO - General Observation - CAPPED CONN. INSIDE THE MH. @ 11 O'CLOCK2.1 ft. MGO - General Observation - 80% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish350.3 ft. MGO - General Observation - 80% MAG COAT FROM 08 TO 04 O'CLOCK, START350.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start352.3 ft. MGO - General Observation - ROACHES INSIDE THE MH.352.3 ft. AMH - Downstream Manhole, Survey Begins - 9:09 AM352.3 ft. MWM - Water Mark, 20 %of cross sectional area352.3 ft. MWL - Water Level, 15 %of cross sectional area

Observation photos (4)

  • General Observation - 80% MAG COAT FROM 08 TO 04 O'CLOCK, START

    2 ft. - General Observation - 80% MAG COAT FROM 08 TO 04 O'CLOCK, START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish

    350.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish

  • Upstream Manhole, Survey Ends - 9:26 AM

    352.3 ft. - Upstream Manhole, Survey Ends - 9:26 AM

Observations (11)

DistanceCodeObservation
0MGOROACHES INSIDE THE MH.
2MGO80% MAG COAT FROM 08 TO 04 O'CLOCK, START
350.3MGOROACHES INSIDE THE MH.
350.2MGO80% MAG COAT FROM 08 TO 04 O'CLOCK, FINISH
0AMH9:09 AM
2SSS
350.2SSS
352.3AMH9:26 AM
0MWM
350.3MGOCAPPED CONN. INSIDE THE MH. @ 11 O'CLOCK
0MWL

Properties (6)

custom_field_three
SPALLING
custom_field_two
3
customer
LACSD
datetime
2016-03-09T09:04:50-08:00
documentation
MIRANDA, MIRABAL, FRANKLIN, SHADLER
is_lateral_inspection
false