Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 8, 2015, 04:30 PM
  • 02 0160_02 0159_1282015_092702.mp4

Date
12/08/2015
W/O
0536410
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00251
PipeID
P02463
Time
8:30 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7009
Sewer Name
02 DOWNEY-BELLFLOWER TRUNK
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
36
Purpose
Routine Assessment
Project
20151204AM_DOWNEY_BELLFLOWER_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Upstream MH
02 0160
Downstream MH
02 0159
Dir. of Survey
Downstream
Length Surveyed
348.6 ft.
Total Length
348.6 ft.
Structural Index
2
Structural Quick
3125
Structural Rating
13
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
19
Pipe schematic from manhole 02 0160 to 02 0159
MH: 02 0160MH: 02 0159downstream0 ft. MGO - General Observation - CAPPED CONN. INSIDE THE MH. @ 09 O'CLOCK0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CAPPED CONN. INSIDE THE MH. @ 03 O'CLOCK0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 9:25 AM2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start9.1 ft. CM - Crack Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES52.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"100.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: YES102.2 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 4"107.6 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"131.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - OPEN136.6 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES162.2 ft. TFD - Tap Factory Made Defective, at 01 o'clock, -, within 8 inches of joint: YES, 6", 6" - OPEN, BROKEN186.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"211 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN214.4 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 6"221.7 ft. CL - Crack Longitudinal, at 08 o'clock, within 8 inches of joint: YES258.2 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES261.4 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES272.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"292 ft. CS - Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES293.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"345.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish346.3 ft. MGO - General Observation - ACTIVE CONN. INSIDE THE MH. @ 04 O'CLOCK346.9 ft. MGO - General Observation - ROACHES INSIDE THE MH.348.6 ft. AMH - Downstream Manhole, Survey Ends - 9:50 AM

Observation photos (1)

  • Tap Factory Made Defective, at 01 o'clock, -, within 8 inches of joint: YES, 6", 6" - OPEN, BROKEN

    162.2 ft. - Tap Factory Made Defective, at 01 o'clock, -, within 8 inches of joint: YES, 6", 6" - OPEN, BROKEN

Observations (28)

DistanceCodeObservation
0MGOCAPPED CONN. INSIDE THE MH. @ 09 O'CLOCK
100.7DAGS
102.2TFA
52.5TFC
0MGOROACHES INSIDE THE MH.
272.3TFC
346.9MGOROACHES INSIDE THE MH.
107.6TFA
0MWM
345.2DAGS
211TFOPEN
261.4CL
131.9TFOPEN
186.8TFC
292CS
0MGOCAPPED CONN. INSIDE THE MH. @ 03 O'CLOCK
2DAGS
348.6AMH9:50 AM
136.6CL
258.2CL
346.3MGOACTIVE CONN. INSIDE THE MH. @ 04 O'CLOCK
293.8TFC
0MWL
0AMH9:25 AM
214.4TFA
9.1CM
162.2TFDOPEN, BROKEN
221.7CL

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2015-12-08T08:30:04-08:00
documentation
MIRANDA, FRANKLIN, SHADLER, MIRABAL
is_lateral_inspection
false