Section_3_30 0051_30 0050__6132018__I0024.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
3.2 ft. - Surface Reinforcement Corroded, from 03 to 04 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
5.2 ft. - Surface Reinforcement Corroded, from 03 to 04 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
7.7 ft. - General Observation - MAG COAT 60% START
74.2 ft. - Water Mark, 30 %of cross sectional area
124.8 ft. - General Observation - 80% MAG COAT START
178.4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERTE AGG
| Distance | Code | Observation |
|---|---|---|
| 220.1 | SAM | SEVERE AGG |
| 0 | MWM | — |
| 5.2 | SRC | CIRCUM REBAR |
| 7.7 | MGO | MAG COAT 60% START |
| 0 | AMH | 3:30AM |
| 220.1 | MGO | MAG COAT 80% FINISH |
| 16.3 | MWL | — |
| 220.1 | SSS | BLISTERING PEELING CONCRETE |
| 124.8 | MGO | 80% MAG COAT START |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 2 | SAM | SEVERE AGG |
| 178.4 | SAM | SEVERTE AGG |
| 16.3 | DSZ | ROCKS |
| 0 | MGO | MH CONN 3:00 STUB |
| 74.2 | MWM | — |
| 0 | MWL | — |
| 220.8 | AMH | 4:00AM |
| 3.2 | SRC | CIRCUM REBAR |