Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 13, 2018, 04:06 PM
  • Section#8_30 0045_30 0044__6132018__I0026.mp4

Date
06/13/2018
W/O
0706884
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00878
PipeID
P17748
Time
9:06 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0026
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
HERMOSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
04
Purpose
Capital Improvement Program Assesment
Project
20180608DF_SOUTH_BAY_CITIES_MAIN_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
30 0045
Downstream MH
30 0044
Dir. of Survey
Downstream
Length Surveyed
378.9 ft.
Total Length
378.9 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 30 0045 to 30 0044
MH: 30 0045MH: 30 0044downstream0 ft. AMH - Upstream Manhole, Survey Begins - 9:08 AM0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN2 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start83.2 ft. MGP - General Photograph177.2 ft. MGP - General Photograph177.2 ft. MGP - General Photograph297.2 ft. MGP - General Photograph370.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish370.3 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 65% MAG370.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish375.4 ft. MGP - General Photograph - MH 0044 ZOOMED378.9 ft. MGO - General Observation - CONN @ MH 3O'CLOCK/ACTIVE378.9 ft. AMH - Downstream Manhole, Survey Ends - 10:03 AM

Observation photos (8)

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    83.2 ft. - General Photograph

  • General Photograph

    177.2 ft. - General Photograph

  • General Photograph

    177.2 ft. - General Photograph

  • General Photograph

    297.2 ft. - General Photograph

  • General Photograph - MH 0044 ZOOMED

    375.4 ft. - General Photograph - MH 0044 ZOOMED

Observations (18)

DistanceCodeObservation
2MGOCONN @ MH 9 O'CLOCK/UNKNOWN
177.2MGP
370.3SSS
2MGOCONN @ MH 3 O'CLOCK/ACTIVE
2SZ65% MAG
0AMH9:08 AM
177.2MGP
0MWL
0MWM
370.3SZ65% MAG
2SSS
378.9MGOCONN @ MH 3O'CLOCK/ACTIVE
378.9AMH10:03 AM
83.2MGP
297.2MGP
375.4MGPMH 0044 ZOOMED
2SAP
370.3SAP

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-06-13T09:06:15-07:00
documentation
FRANKLIN, PARAISO, IGNACIO
is_lateral_inspection
false