Wastewater/Activity/PacpInspection/1.0Sep 20, 2017, 10:06 AM
  • Section#14_G 0144_G 0143__9202017__G6826.mp4

Date
09/20/2017
W/O
0646302
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01180
PipeID
P01467
Time
3:06 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6826
Sewer Name
G JOINT OUTFALL G - UNIT 8
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
17
Purpose
Capital Improvement Program Assesment
Project
20170916MDM_JOINT_OUTFALL_G_UNIT_8
Material
RCP-CTL
Shape
Circular
Height
36 in.
Upstream MH
G 0144
Downstream MH
G 0143
Dir. of Survey
Downstream
Length Surveyed
407.6 ft.
Total Length
407.6 ft.
Structural Index
3
Structural Quick
3O00
Structural Rating
243
O&M Index
4
O&M Quick
5232
O&M Rating
16
Overall Index
3
Overall Quick
Overall Rating
259
Pipe schematic from manhole G 0144 to G 0143
MH: G 0144MH: G 0143downstream0 ft. MWL - Water Level, 70 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:15AM0 ft. MGO - General Observation - MH CONN 9:00 STUB0 ft. MWM - Water Mark, 80 %of cross sectional area0 ft. MGO - General Observation - MH CONN 3:00 STUB2 ft. MGO - General Observation - TILES 100% MISSING2 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES5.4 ft. MGO - General Observation - TILES 20% MISSING & PARTIAL START 10:00 TO 2:008.9 ft. MGO - General Observation - MAG COAT WITH GREASE 30% START11.3 ft. MGO - General Observation - MISSING TILES 30%68.1 ft. MGO - General Observation - 30% MISSING TILES START 10:00 TO 2:00149.2 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start161.4 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Finish182.2 ft. MWL - Water Level, 80 %of cross sectional area182.2 ft. MWM - Water Mark, 100 %of cross sectional area182.3 ft. MGO - General Observation - RMAINDER ON CLIP # 3336.1 ft. MGO - General Observation - MISSING & PARTIAL TILES 60% START 10:00 TO 2:00407.2 ft. MGO - General Observation - 60% MISSING & PARTIAL TILES FINISH 10:00 TO 2:00407.2 ft. MGO - General Observation - MAG COAT WITH GREASE 25% FINISH407.2 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG AREAS OF MISSING TILES407.6 ft. AMH - Downstream Manhole, Survey Ends - 5:55AM

Observation photos (7)

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES

    2 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AREAS OF MISSING TILES

  • General Observation - TILES 20% MISSING & PARTIAL START 10:00 TO 2:00

    5.4 ft. - General Observation - TILES 20% MISSING & PARTIAL START 10:00 TO 2:00

  • General Observation - MAG COAT WITH GREASE 30% START

    8.9 ft. - General Observation - MAG COAT WITH GREASE 30% START

  • General Observation - MISSING TILES 30%

    11.3 ft. - General Observation - MISSING TILES 30%

  • General Observation - 30% MISSING TILES START 10:00 TO 2:00

    68.1 ft. - General Observation - 30% MISSING TILES START 10:00 TO 2:00

  • Deposits Attached Grease, 20 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: YES, Start

    149.2 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MISSING  & PARTIAL TILES 60% START 10:00 TO 2:00

    336.1 ft. - General Observation - MISSING & PARTIAL TILES 60% START 10:00 TO 2:00

Observations (21)

DistanceCodeObservation
407.2MGO60% MISSING & PARTIAL TILES FINISH 10:00 TO 2:00
336.1MGOMISSING & PARTIAL TILES 60% START 10:00 TO 2:00
149.2DAGS
2MGOTILES 100% MISSING
182.2MWL
0MWL
68.1MGO30% MISSING TILES START 10:00 TO 2:00
161.4DAGS
407.6AMH5:55AM
407.2MGOMAG COAT WITH GREASE 25% FINISH
182.3MGORMAINDER ON CLIP # 3
8.9MGOMAG COAT WITH GREASE 30% START
407.2SAPSEVERE AGG AREAS OF MISSING TILES
11.3MGOMISSING TILES 30%
0AMH5:15AM
0MGOMH CONN 9:00 STUB
0MWM
0MGOMH CONN 3:00 STUB
182.2MWM
5.4MGOTILES 20% MISSING & PARTIAL START 10:00 TO 2:00
2SAPSEVERE AGG AREAS OF MISSING TILES

Properties (6)

custom_field_three
60% MISSING TILES - SEVERE AGG
custom_field_two
1
customer
LACSD
datetime
2017-09-20T03:06:20-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false