Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 16, 2017, 02:16 PM
  • Section#8_G 0146_G 0145__9162017__G6823.mp4

Date
09/16/2017
W/O
0646302
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01180
PipeID
P01469
Time
7:16 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6823
Sewer Name
G JOINT OUTFALL G - UNIT 8
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
17
Purpose
Capital Improvement Program Assesment
Project
20170916MDM_JOINT_OUTFALL_G_UNIT_8
Material
RCP-CTL
Shape
Circular
Height
36 in.
Upstream MH
G 0146
Downstream MH
G 0145
Dir. of Survey
Downstream
Length Surveyed
132.9 ft.
Total Length
132.9 ft.
Structural Index
3
Structural Quick
3A00
Structural Rating
30
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
35
Pipe schematic from manhole G 0146 to G 0145
MH: G 0146MH: G 0145downstream0 ft. MWL - Water Level, 70 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 7:45AM0 ft. MGO - General Observation - MH CONN 3:00 STUB0 ft. MGO - General Observation - MH CONN 3:00 STUB0 ft. MWM - Water Mark, 80 %of cross sectional area2 ft. MGO - General Observation - MISSING & PARTIAL TILES 80%2 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG7.9 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO, Finish - SEVERE AGG7.9 ft. MGO - General Observation - MISSING & PARTIAL TILES 20% START 10:00 TO 2:008 ft. MGO - General Observation - TILES IN PLACE18.7 ft. MGO - General Observation - PARTIAL TILE 12:0022.8 ft. MGO - General Observation - MAG COAT 25%31.5 ft. MGO - General Observation - MISSING & PARTIAL TILES 10% START65.9 ft. MGO - General Observation - PARTIAL TILES94.4 ft. MGO - General Observation - MISSING & PARTIAL TILES START 10:00 TO 2:0094.4 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - AREAS OF MISSING TILES132.2 ft. MGO - General Observation - MISSING & PARTIAL TILES 30% FINISH132.2 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG AREAS OF MISSING TILES132.9 ft. AMH - Downstream Manhole, Survey Ends - 8:10AM

Observation photos (9)

  • General Observation - MISSING & PARTIAL TILES 80%

    2 ft. - General Observation - MISSING & PARTIAL TILES 80%

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG

  • General Observation - TILES IN PLACE

    8 ft. - General Observation - TILES IN PLACE

  • General Observation - PARTIAL TILE 12:00

    18.7 ft. - General Observation - PARTIAL TILE 12:00

  • General Observation - MAG COAT 25%

    22.8 ft. - General Observation - MAG COAT 25%

  • General Observation - MISSING & PARTIAL TILES 10% START

    31.5 ft. - General Observation - MISSING & PARTIAL TILES 10% START

  • General Observation - PARTIAL TILES

    65.9 ft. - General Observation - PARTIAL TILES

  • General Observation - MISSING & PARTIAL TILES START 10:00 TO 2:00

    94.4 ft. - General Observation - MISSING & PARTIAL TILES START 10:00 TO 2:00

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - AREAS OF MISSING TILES

    94.4 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - AREAS OF MISSING TILES

Observations (19)

DistanceCodeObservation
0MWL
7.9SAPSEVERE AGG
132.9AMH8:10AM
7.9MGOMISSING & PARTIAL TILES 20% START 10:00 TO 2:00
94.4MGOMISSING & PARTIAL TILES START 10:00 TO 2:00
2MGOMISSING & PARTIAL TILES 80%
132.2MGOMISSING & PARTIAL TILES 30% FINISH
0AMH7:45AM
0MGOMH CONN 3:00 STUB
0MGOMH CONN 3:00 STUB
18.7MGOPARTIAL TILE 12:00
0MWM
132.2SAVSEVERE AGG AREAS OF MISSING TILES
65.9MGOPARTIAL TILES
31.5MGOMISSING & PARTIAL TILES 10% START
8MGOTILES IN PLACE
94.4SAVAREAS OF MISSING TILES
22.8MGOMAG COAT 25%
2SAPSEVERE AGG

Properties (6)

custom_field_three
30% MISSING TILES -SEVERE AGG AREAS OF MISSING TIL
custom_field_two
2
customer
LACSD
datetime
2017-09-16T07:16:52-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false