Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 24, 2020, 09:07 AM
  • 22 0105_22 0104_11242020_012200.mp4

Date
11/24/2020
W/O
854905
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00805
PipeID
P16346
Time
1:07 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8256
Sewer Name
DISTRICT #22 MAIN TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
WO_854905_TV22151_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
22 0105
Downstream MH
22 0104
Dir. of Survey
Downstream
Length Surveyed
409.9 ft.
Total Length
409.9 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
405
O&M Index
2
O&M Quick
412O
O&M Rating
166
Overall Index
2
Overall Quick
Overall Rating
571
Pipe schematic from manhole 22 0105 to 22 0104
MH: 22 0105MH: 22 0104downstream0 ft. MGO - General Observation - ROACHES @ MANHOLE0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 01052 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start53.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"61.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"92.2 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"110.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"118.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"167 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"175.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"232.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"240 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"297.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"305.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"340.4 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"346 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN355.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"407.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish407.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish407.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish409.9 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE409.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0104409.9 ft. MGO - General Observation - ROACHES @ MANHOLE

Observation photos (5)

  • General Observation - ROACHES @ MANHOLE

    0 ft. - General Observation - ROACHES @ MANHOLE

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MANHOLE

    409.9 ft. - General Observation - ROACHES @ MANHOLE

Observations (28)

DistanceCodeObservation
407.3SAP
0MGOROACHES @ MANHOLE
409.9MGOCONN @ MH 3 O'CLOCK/ACTIVE
355.2TFC
2DAGS
92.2TFA
110.8TFC
53.4TFC
407.3SSS
118.8TFC
167TFC
175.6TFC
240TFC
232.1TFC
0MWL
0MWM
346TFUNKNOWN
2SAP
409.9AMH22 0104
0AMH22 0105
407.3DAGS
297.5TFC
305.3TFC
2MGO65% MAG COAT
61.4TFA
409.9MGOROACHES @ MANHOLE
340.4TFA
2SSS

Properties (7)

additional_info
630069112320201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-11-24T01:07:24-08:00
documentation
PRO PIPE
is_lateral_inspection
false