Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 3, 2020, 11:05 AM
  • 22 0102_22 0101_12032020_032150.mp4

Date
12/03/2020
W/O
854905
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00805
PipeID
P16343
Time
3:05 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8229
Sewer Name
DISTRICT #22 MAIN TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
WO_854905_TV22151_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
22 0102
Downstream MH
22 0101
Dir. of Survey
Downstream
Length Surveyed
317.3 ft.
Total Length
317.3 ft.
Structural Index
3
Structural Quick
3L00
Structural Rating
189
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
189
Pipe schematic from manhole 22 0102 to 22 0101
MH: 22 0102MH: 22 0101downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 22 01020 ft. MWL - Water Level, 20 %of cross sectional area2 ft. MGO - General Observation - ROACHES @ MH2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - 60% MAG COAT23.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"78.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"86 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"132.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"148.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN187.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"203.4 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 4", 8"258.1 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 4", 8"265.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"316.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish317 ft. MGO - General Observation - ROACHES @ MH317.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0101

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN

    148.5 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN

  • Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 4", 8"

    203.4 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 4", 8"

  • Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 4", 8"

    258.1 ft. - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 4", 8"

Observations (19)

DistanceCodeObservation
2MGOROACHES @ MH
2SAP
203.4TBA
187.3TFC
0MWM
132.9TFC
0MGOCONN @ MH 3 O'CLOCK/ACTIVE
258.1TBA
86TFC
265.3TFC
78.2TFC
316.3SAP
0AMH22 0102
0MWL
2.1MGO60% MAG COAT
23.8TFC
148.5TBOPEN
317MGOROACHES @ MH
317.3AMH22 0101

Properties (6)

custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-12-03T03:05:15-08:00
documentation
PRO PIPE
is_lateral_inspection
false