Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 2, 2020, 10:36 AM
  • 22 0124_22 0123_12022020_025013.mp4

Date
12/02/2020
W/O
854904
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00805
PipeID
P16366
Time
2:36 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8320
Sewer Name
DISTRICT #22 MAIN TRUNK
City
COVINA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
26
Purpose
Routine Assessment
Project
WO_854905_TV22151_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
22 0124
Downstream MH
22 0123
Dir. of Survey
Downstream
Length Surveyed
396.1 ft.
Total Length
396.1 ft.
Structural Index
3
Structural Quick
3O00
Structural Rating
237
O&M Index
2
O&M Quick
2O00
O&M Rating
156
Overall Index
3
Overall Quick
Overall Rating
393
Pipe schematic from manhole 22 0124 to 22 0123
MH: 22 0124MH: 22 0123downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 01240 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/OPEN0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - 85% MAG COAT2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start52.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"98.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"154.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"200.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"248.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"295 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"341.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"394 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish396 ft. MGO - General Observation - ROACHES @ MH396.1 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE396.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0123396.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (1)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
98.9TFC
248.2TFC
52.3TFC
396MGOROACHES @ MH
154.4TFC
0AMH22 0124
396.1MGOCONN @ MH 3 O'CLOCK/ACTIVE
0MGOCONN @ MH 3 O'CLOCK/OPEN
0MWM
295TFC
0MGOROACHES @ MH
396.1AMH22 0123
394DAGS
2.1MGO85% MAG COAT
2DAGS
0MWL
2.1SAV
200.8TFC
396.1SAV
341.5TFC

Properties (7)

additional_info
630138120120201
custom_field_three
AGGREGATE VISIBLE
custom_field_two
2
customer
1
datetime
2020-12-02T02:36:16-08:00
documentation
PROPIPE
is_lateral_inspection
false