Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 1, 2020, 09:07 AM
  • 22 0111_22 0110_12012020_012201.mp4

Date
12/01/2020
W/O
854904
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00805
PipeID
P16352
Time
1:07 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8319
Sewer Name
DISTRICT #22 MAIN TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
WO_854905_TV22151_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
22 0111
Downstream MH
22 0110
Dir. of Survey
Downstream
Length Surveyed
243.3 ft.
Total Length
243.3 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
240
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
240
Pipe schematic from manhole 22 0111 to 22 0110
MH: 22 0111MH: 22 0110downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 01110 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 OCLOCK/ACTIVE3.3 ft. MGO - General Observation - 80% MAG COAT3.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start68.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN100.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN124.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"156 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"164 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"204.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6"236.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"243 ft. MGO - General Observation - ROACHES @ MH243.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0110243.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish243.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
0AMH22 0111
243.3AMH22 0110
124.2TFC
0MWM
236.1TFC
3.3MGO80% MAG COAT
3.3SSS
156TFC
0MGOROACHES @ MH
243.3SSS
3.3SAP
68.5TFOPEN
100.6TFOPEN
243MGOROACHES @ MH
0MWL
243.3SAP
204.5TFA
0MGOCONN @ MH 9 OCLOCK/ACTIVE
164TFC

Properties (7)

additional_info
630098113020201
custom_field_three
SPALLING/ AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2020-12-01T01:07:41-08:00
documentation
PROPIPE
is_lateral_inspection
false