Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 2, 2020, 09:59 AM
  • 22 1158_22 1157_12022020_020511.mp4

Date
12/02/2020
W/O
854904
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00805
PipeID
P21526
Time
1:59 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8320
Sewer Name
DISTRICT #22 MAIN TRUNK
City
COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
26
Purpose
Routine Assessment
Project
WO_854905_TV22151_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
22 1158
Downstream MH
22 1157
Dir. of Survey
Downstream
Length Surveyed
71.6 ft.
Total Length
71.6 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
70
O&M Index
2
O&M Quick
2B00
O&M Rating
26
Overall Index
2
Overall Quick
Overall Rating
96
Pipe schematic from manhole 22 1158 to 22 1157
MH: 22 1158MH: 22 1157downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 11582 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT3.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start69 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish71.5 ft. MGO - General Observation - ROACHES @ MH71.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish71.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish71.6 ft. AMH - Downstream Manhole, Survey Ends - 22 1157

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0MWL
71.5MGOROACHES @ MH
71.6SSS
3.6SAP
3.6SSS
0MWM
0AMH22 1158
69DAGS
2DAGS
2MGO65% MAG COAT
71.6SAP
71.6AMH22 1157

Properties (7)

additional_info
630138120120201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
3
customer
1
datetime
2020-12-02T01:59:34-08:00
documentation
PROPIPE
is_lateral_inspection
false