Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 23, 2020, 10:35 AM
  • 22 0168_22 0167_11232020_024907.mp4

Date
11/23/2020
W/O
854905
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00805
PipeID
P16410
Time
2:35 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8255
Sewer Name
DISTRICT #22 MAIN TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
28
Purpose
Routine Assessment
Project
WO_854905_TV22151_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0168
Downstream MH
22 0167
Dir. of Survey
Downstream
Length Surveyed
332.1 ft.
Total Length
332.1 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
330
O&M Index
2
O&M Quick
412L
O&M Rating
136
Overall Index
2
Overall Quick
Overall Rating
466
Pipe schematic from manhole 22 0168 to 22 0167
MH: 22 0168MH: 22 0167downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 01680 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MGO - General Observation - ROACHES @ MANHOLE0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start30.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"79 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN132 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN233.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"282.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"330.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish330.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish330.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish332.1 ft. MGO - General Observation - ROACHES @ MANHOLE332.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0167

Observation photos (5)

  • General Observation - ROACHES @ MANHOLE

    0 ft. - General Observation - ROACHES @ MANHOLE

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ROACHES @ MANHOLE

    332.1 ft. - General Observation - ROACHES @ MANHOLE

Observations (18)

DistanceCodeObservation
332.1MGOROACHES @ MANHOLE
0AMH22 0168
233.9TFA
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
330.2SSS
2SAP
0MGOROACHES @ MANHOLE
332.1AMH22 0167
132TFUNKNOWN
0MWM
30.4TFA
282.2TFC
330.2SAP
79TFUNKNOWN
0MWL
2SSS
330.2DAGS
2DAGS

Properties (7)

additional_info
630069112320001
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-11-23T02:35:28-08:00
documentation
PRO PIPE
is_lateral_inspection
false