Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 23, 2020, 11:19 AM
  • 22 0166_22 0165_11232020_033121.mp4

Date
11/23/2020
W/O
854905
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00805
PipeID
P16408
Time
3:19 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8255
Sewer Name
DISTRICT #22 MAIN TRUNK
City
SAN DIMAS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
28
Purpose
Routine Assessment
Project
WO_854905_TV22151_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0166
Downstream MH
22 0165
Dir. of Survey
Downstream
Length Surveyed
352.2 ft.
Total Length
352.2 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
350
O&M Index
2
O&M Quick
2M00
O&M Rating
140
Overall Index
2
Overall Quick
Overall Rating
490
Pipe schematic from manhole 22 0166 to 22 0165
MH: 22 0166MH: 22 0165downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 01662 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 75% MAG COAT50.9 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN95.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"151 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN192 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"249.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"298.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"350.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish350.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish350.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish352 ft. MGO - General Observation - ROACHES @ MH352.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0165

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
298.7TFA
0MWL
2SAP
350.9SAP
50.9TBOPEN
350.9SSS
2DAGS
2SSS
0MWM
95.6TFC
2MGO75% MAG COAT
350.9DAGS
192TFC
249.2TFC
0AMH22 0166
151TFUNKNOWN
352MGOROACHES @ MH
352.2AMH22 0165

Properties (7)

additional_info
630069112320001
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-11-23T03:19:45-08:00
documentation
PRO PIPE
is_lateral_inspection
false