Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 2, 2020, 06:15 AM
  • 22 0159_22 0158_12012020_223804.mp4

Date
12/01/2020
W/O
854904
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00805
PipeID
P16401
Time
10:15 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8320
Sewer Name
DISTRICT #22 MAIN TRUNK
City
SAN DIMAS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
27
Purpose
Routine Assessment
Project
WO_854905_TV22151_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
22 0159
Downstream MH
22 0158
Dir. of Survey
Downstream
Length Surveyed
372.7 ft.
Total Length
372.7 ft.
Structural Index
2
Structural Quick
322N
Structural Rating
154
O&M Index
2
O&M Quick
2N00
O&M Rating
148
Overall Index
2
Overall Quick
Overall Rating
302
Pipe schematic from manhole 22 0159 to 22 0158
MH: 22 0159MH: 22 0158downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/UNKNOWN0 ft. AMH - Upstream Manhole, Survey Begins - 22 01592 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start17.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"85.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"133.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"140.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"179.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"188 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"226.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"235.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"282.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"290 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"328 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - UNKNOWN336.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"370 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish372.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish372.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0158372.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
372.7SSS
188TFC
4.1SAP
370DAGS
0MWL
17.6TFC
140.1TFC
235.3TFC
372.7AMH22 0158
226.9TFC
0MWM
4.1SSS
133.1TFC
0MGOCONN @ MH 9 O'CLOCK/UNKNOWN
179.8TFC
336.3TFC
2DAGS
0AMH22 0159
290TFC
282.3TFC
85.6TFC
372.7SAP
328TFUNKNOWN

Properties (7)

additional_info
630138120120201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2020-12-01T22:15:34-08:00
documentation
PROPIPE
is_lateral_inspection
false