- Date
- 12/01/2020
- W/O
- 854904
- Weather
- Dry
- Operator/Surveyor
- B.FUGATE
- Sewer ID
- Z00805
- PipeID
- P16398
- Time
- 11:08 PM
- Certificate
- U-508-7069
- System Owner
- 1
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K8320
- Sewer Name
- DISTRICT #22 MAIN TRUNK
- City
- SAN DIMAS
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 22
- Page No.
- 27
- Purpose
- Routine Assessment
- Project
- WO_854905_TV22151_OCT2020
- Sewer Type
- Gravity
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 18 in.
- Width
- 18 in.
- Upstream MH
- 22 0156
- Downstream MH
- 22 0155
- Dir. of Survey
- Downstream
- Length Surveyed
- 397.1 ft.
- Total Length
- 397.1 ft.
- Structural Index
- 3
- Structural Quick
- 3O2O
- Structural Rating
- 395
- O&M Index
- 2
- O&M Quick
- 2O00
- O&M Rating
- 160
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 555
Pipe schematic from manhole 22 0156 to 22 0155 Observation photos (3)

2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

334.8 ft. - Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: NO, 6", 3" - ACTIVE