Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 2, 2020, 07:38 AM
  • 22 0152_22 0151_12012020_235427.mp4

Date
12/01/2020
W/O
854904
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00805
PipeID
P16394
Time
11:38 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8320
Sewer Name
DISTRICT #22 MAIN TRUNK
City
SAN DIMAS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
27
Purpose
Routine Assessment
Project
WO_854905_TV22151_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
22 0152
Downstream MH
22 0151
Dir. of Survey
Downstream
Length Surveyed
399.3 ft.
Total Length
399.3 ft.
Structural Index
3
Structural Quick
513O
Structural Rating
400
O&M Index
2
O&M Quick
2O00
O&M Rating
158
Overall Index
2
Overall Quick
Overall Rating
558
Pipe schematic from manhole 22 0152 to 22 0151
MH: 22 0152MH: 22 0151downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 01520 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 65% MAG COAT2.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"50.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"94.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"149.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"196.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"251.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"273 ft. SRV - Surface Reinforcement Visible, at 08 o'clock, within 8 inches of joint: YES298.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"345.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"397 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish399 ft. MGO - General Observation - ROACHES @ MH399.3 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/CAPPEDE399.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish399.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0151399.3 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE399.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (23)

DistanceCodeObservation
2DAGS
399.3MGOCONN @ MH 9 O'CLOCK/CAPPEDE
298.9TFC
399.3SAP
2MGO65% MAG COAT
2.2SSS
0MWM
399.3AMH22 0151
7.9TFC
345.6TFC
0AMH22 0152
399MGOROACHES @ MH
2.2SAP
399.3MGOCONN @ MH 3 O'CLOCK/ACTIVE
251.6TFC
50.6TFC
399.3SSS
397DAGS
94.5TFC
273SRV
149.3TFC
0MWL
196.9TFC

Properties (7)

additional_info
630138120120201
custom_field_three
AGGREGATE PROJECTING/SPALLING
custom_field_two
2
customer
1
datetime
2020-12-01T23:38:31-08:00
documentation
PROPIPE
is_lateral_inspection
false