Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 18, 2020, 07:21 AM
  • 16 0534_16 0720_11172020_234744.mp4

Date
11/17/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P23032
Time
11:21 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8216
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Square
Height
27 in.
Width
27 in.
Upstream MH
16 0534
Downstream MH
16 0720
Dir. of Survey
Downstream
Length Surveyed
147.6 ft.
Total Length
147.6 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
145
O&M Index
3
O&M Quick
3E00
O&M Rating
87
Overall Index
3
Overall Quick
Overall Rating
232
Pipe schematic from manhole 16 0534 to 16 0720
MH: 16 0534MH: 16 0720downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 16 05342.3 ft. DSF - Deposits Settled Fine, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAG COAT9.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"29 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"32.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"35.3 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"76.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"80.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"127.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"140.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"147.6 ft. MSA - Survey Abandoned - DUE TO DEBRIS147.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish147.6 ft. DSF - Deposits Settled Fine, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish147.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (7)

  • Deposits Settled Fine,  15 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Settled Fine, 15 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.3 ft. - General Observation - MAG COAT

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    29 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    127.8 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

  • Survey Abandoned - DUE TO DEBRIS

    147.6 ft. - Survey Abandoned - DUE TO DEBRIS

Observations (19)

DistanceCodeObservation
0MWL
80.5TF
147.6MSADUE TO DEBRIS
35.3TB
2.3DSF
140.2TFC
29TB
9.1TFC
0MWM
147.6SSS
32.4TFC
2.3SSS
2.3SAP
147.6DSF
147.6SAP
127.8TB
0AMH16 0534
76.5TF
2.3MGOMAG COAT

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-17T23:21:14-08:00
documentation
PRO PIPE
is_lateral_inspection
false