Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2020, 10:33 AM
  • 16 0544_16 0543_11172020_024330.mp4

Date
11/17/2020
W/O
854910
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00659
PipeID
P13595
Time
2:33 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8214
Sewer Name
LAMANDA PARK TRUNK
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
15
Purpose
Routine Assessment
Project
WO_854910_TV16078_OCT2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
16 0544
Downstream MH
16 0543
Dir. of Survey
Downstream
Length Surveyed
188 ft.
Total Length
188 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
185
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
185
Pipe schematic from manhole 16 0544 to 16 0543
MH: 16 0544MH: 16 0543downstream0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 16 05440 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start52.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"150.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"154.6 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"186.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish186.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish187.3 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK188 ft. AMH - Downstream Manhole, Survey Ends - 16 0543

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"

    52.2 ft. - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

    154.6 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

Observations (14)

DistanceCodeObservation
0MGOCONNECTION AT MH, 3 O'CLOCK
186.5SSS
154.6TB
2SSS
0AMH16 0544
2MGOMAG COAT
187.3MGOCONNECTION AT MH, 3 O'CLOCK
186.5SAP
0MWM
2SAP
0MWL
188AMH16 0543
52.2TFC
150.2TFC

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2020-11-17T02:33:43-08:00
documentation
PRO PIPE
is_lateral_inspection
false