16 0542_16 0541_11172020_012135.mp4
2.5 ft. - General Observation - MAG COAT
2.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
27.1 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 8"
74.9 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"
129.6 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"
177.3 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: YES, 8"
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 16 0542 |
| 177.3 | TBA | — |
| 0 | MWL | — |
| 0 | MWM | — |
| 219.6 | AMH | 16 0541 |
| 217.3 | SSS | — |
| 74.9 | TBA | — |
| 2.5 | MGO | MAG COAT |
| 2.5 | SAP | — |
| 27.1 | TB | — |
| 2.5 | SSS | — |
| 217.3 | SAP | — |
| 0 | MGO | CONNECTION AT MH, 3 O'CLOCK |
| 129.6 | TB | — |
| 23.1 | TFC | — |